Balansert Ventilasjonsanlegg Grant
Funding route · apply any time
- Amount
- NOK 16K
- Deadline
- Rolling: no fixed deadline
- Who can apply
- Individuals, SMEs · Norway
Free accounts: 1 official link a month · Pro: every link
In context
This call is open to individuals and small and medium-sized businesses. Funding is a grant. Coverage is read from the notice itself: Norway. The funder accepts early-stage applicants.
Summary
Enova's support for balanced ventilation systems with heat recovery in homes, paid as a share of approved invoiced costs after approval and completed work. It is aimed at Norwegian homeowners and property owners who want to improve indoor climate and reduce heating energy use.
About this grant
This grant supports homeowners and residents in Norway who want to install a balanced heat recovery ventilation system in their dwelling. The aim is most relevant to homes being upgraded through energy retrofits, where air quality and dampness can become a concern after the building envelope is improved. Invoices must itemise materials and labour, record the unit's model name, and name the supplier along with its organisation number. The installation must be correctly dimensioned and commissioned, with a commissioning report for air distribution between rooms. Miniventilation units built into outer wall penetrations follow a different route and do not go through the standard commissioning process. Applications are judged on technical compliance rather than competitive scoring: the building application date, the heat exchanger efficiency, a compliant invoice and a documented commissioning report. Complete documentation must reach the funder before the stated deadline for payment to be released.
Full description from the source
Enova's support for a balanced ventilation system (balansert ventilasjonsanlegg) in homes. A balanced ventilation unit supplies filtered fresh air while a heat exchanger recovers up to 90 percent of the heat from extracted indoor air, improving indoor climate, reducing moisture problems and lowering energy costs for heating. Enova notes the system works best in airtight dwellings with a correctly dimensioned installation, and recommends planning it alongside insulation work such as wall or roof insulation or window replacement. The support is paid as a share of approved invoiced costs once the applicant has received approval, carried out the measure as agreed and submitted documentation before the deadline. Enova also recommends obtaining quotes from several suppliers and requires commissioning (innregulering) of air distribution between rooms with a commissioning report. The page also describes combinations with other Enova-supported measures such as energy advice, window and door upgrades, and insulation of walls and roofs.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
Eligibility
Applies to homeowners and residents of dwellings in Norway who plan to install a balanced ventilation system. The dwelling must have an approved building application dated before 1 July 2010. The system must have a heat exchanger with a minimum annual average temperature efficiency of 80 percent. The applicant must apply and receive approval before starting the measure. Invoices must itemise all costs including materials and labour and show the balanced ventilation unit model name, and must name the supplier and its organisation number. Miniventilation units with built-in heat exchangers in outer wall penetrations are treated differently and do not receive the standard commissioning process.
How it's scored
Applications are assessed against technical requirements rather than competitive scoring: approval of the building application date, heat exchanger efficiency of at least 80 percent, a compliant invoice, and documented commissioning with a report. The page does not describe scoring weights or a review panel.
Key requirements
- Obtain approval from Enova before starting the measure
- Install a correctly dimensioned balanced ventilation system with heat recovery, commissioned (innregulering) with a commissioning report
- Submit complete documentation before the deadline to receive payment as a share of approved invoiced costs
Frequently asked questions
Frequently asked questions
- How much funding does Enova offer?
- Balansert Ventilasjonsanlegg offers NOK 16K.
- When is the Balansert Ventilasjonsanlegg deadline?
- This is a rolling call with no fixed deadline, so applications are accepted on an ongoing basis.
- Who can apply for Balansert Ventilasjonsanlegg?
- Eligibility covers individuals and SMEs in Norway. See the eligibility criteria above for the full conditions.
Relevant sectors
How this compares
How this compares
- Compared with 20 similar grants (efficiency in Norway) listed in the last 12 months.
- Its value of $2k is at the low end of the 5 similar grants that state a value; their median is $29k.
- The same organisation listed 20 other similar grants here in the last 12 months.
Closest open grants
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
Named in this listing. Check the official listing for the full list.
- Approved building application dated before 1 July 2010
- Invoice itemising all costs including materials and labour
- Invoice showing the balanced ventilation unit model name
- Invoice naming the supplier and its organisation number
- Commissioning report (innregulering)