This grant closed on 5 May 2026. The deadline passed 202 days ago.

You can no longer apply, but the details below are kept for reference. Similar calls still open:

Swedish Energy AgencyClosed

Charging infrastructure for heavy road transport at properties with loading and unloading, 05 May 2026 — Other: The Swedish Energy Agency announces funding to strengthen the expansion of charging infrastructure for heavy vehicles...

Amount
SEK 19.4M
Deadline
5 May 2026, 23:59 UTCDeadline passed
Who can apply
Large companies, SMEs, local authorities and 2 more · Sweden

In context

This call is open to large companies, small and medium-sized businesses and local authorities and 2 others, at scale-up and mature and Series A. Funding is a grant. Coverage is read from the notice itself: Sweden.

Summary

Funds construction, installation, upgrading and expansion of charging infrastructure for heavy road vehicles at logistics sites such as terminals, warehouses and recycling centres that are open to all hauliers. Aimed at property owners and operators applying in a competitive tender under the Swedish Energy Agency's Regional Electrification Pilots for Heavy Transport programme.

Summary by Raise Lens from the official notice · 21 Nov 2026Accurate?

About this grant

The call supports the building and fitting of charging infrastructure for heavy electric lorries at goods-handling sites in Sweden, covering up to half of eligible costs, to a ceiling of 20 million SEK per project. Eligible locations include transport hubs, storage facilities, waste handling plants and comparable premises that remain open to every haulier operating there. Projects are ranked competitively by cost per kilowatt, with lower SEK/kW figures scoring higher. Applicants may be large firms, small and medium enterprises, local authorities, non-profit bodies or engineering contractors, provided they plan to build stations on a property where strategically important activity takes place, such as warehousing, transfers between modes at ports and intermodal terminals, large-scale goods receipt, transhipment or recycling. They must then operate for a minimum of five years and serve transport operators other than the grant holder. Mandatory requirements are checked before ranking, and there is limited scope to supplement an application afterwards. The application deadline is 5 May 2026, at 23:59.

Full description from the source

The Swedish Energy Agency (Energimyndigheten) is calling for applications to fund charging infrastructure for heavy road vehicles at properties where loading and unloading takes place. Eligible sites include terminals, warehouses, recycling centres and similar locations that are open to all hauliers with business on the site. The call is part of the Regional Electrification Pilots for Heavy Transport programme and aims to increase the electrification of heavy road freight. The call supports the construction, installation, upgrading and expansion of charging infrastructure. Eligible costs include the grid connection (electrical storage) linked to the charging station, which is capped at half of the station's total maximum output and at most 10,000 SEK per kW. Eligible costs are only those incurred within the project and between the submission of the application and the project end date. Charging points must be able to deliver at least 150 kW, with load balancing permitted down to 75 kW. Charging stations must be completed by 30 September 2029 and remain in operation for at least five years after completion. The charging station must be open to transport operators other than the grant recipient. Funding is awarded through a competitive tender. Applications are ranked by funding efficiency, meaning the ratio of the amount of funding sought to the new installed total output at maximum use (SEK per kW). Projects that include innovative but expensive technology have the requested amount adjusted downward by up to 50 percent for ranking purposes. The Agency will reject at least the lowest-ranked 10 percent of applications. Where funds remain after the call closes, the Agency may open a follow-up call.

This grant has closed

Similar grants are open now. Pro keeps the official link on every listing, closed ones included.

Eligibility

Applicants are actors planning to build charging stations for heavy transport on a property where activity of strategic importance is carried out for one or more of the following purposes linked to heavy transport: warehousing of goods and merchandise; transfer between transport modes for goods and freight, such as ports and intermodal terminals; large-scale goods reception; transhipment centres; and recycling and waste management. Both large and medium-sized enterprises may apply for up to 50 percent of eligible costs. The call is open to Swedish sites, as the Agency is a Swedish national body and the programme is governed by Swedish regulation (SFS 2022:107). The charging station must be open to transport operators other than the grant recipient. Projects must meet the mandatory requirements of the call text before submission, as there is limited opportunity to supplement applications after submission.

How it's scored

Applications are assessed in a competitive tender. Mandatory requirements (skallkrav) are checked first, and applications that meet them are ranked by funding efficiency, defined as the requested grant amount divided by the new installed total charging output at maximum use, expressed in SEK per kW. A lower ratio ranks higher. Where innovative but costlier technology is included, the requested amount is adjusted downward by up to 50 percent for the ranking calculation. The Agency rejects at least the lowest-ranked 10 percent. Applications must be submitted before the deadline of 5 May 2026 at 23:59. No information is given on panel composition.

Key requirements

  • Charging points must deliver at least 150 kW, with load balancing permitted down to 75 kW
  • Stations must be completed by 30 September 2029 and operate for at least five years after completion
  • Charging must be open to transport operators other than the grant recipient; grid connection costs capped at half the station's maximum output and 10,000 SEK per kW

Funder contact

The notice names a programme contact you can speak to before applying.

How this compares

About this sector

Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceSwedish Energy Agency
Match funding50%
EligibilitySweden
Org typesLarge companies, SMEs, local authorities, non-profits, engineering contractors
Last verified21 Nov 2026

Documents to prepare

We found no document list in this listing. Usually asked for in capital grants; typical only, not this funder’s list. Check the official listing.

  • Project plan with timeline and milestones
  • Quotes or cost estimates for the works or equipment
  • Proof of ownership, lease or permission for the site
  • Planning permission or permits, where needed
  • Evidence of match funding
  • Latest annual accounts