Skip to content
Raise Lens
Grants.govEarly-stage friendlyClosed

Improving Lake Superior outflow regulation and quantifying uncertainty

DOD-COE-ERDC

Amount
$200K
Deadline
6 Jul 2026Deadline passed
Who can apply
Universities, research institutions, non-profits and 1 more · United States

In context

This call is open to universities, research institutions and non-profits and 1 other, at idea and R&D stage and prototype and pilot stage. Funding is a grant. Coverage is read from the notice itself: United States.

Summary

This grant funds research to improve Lake Superior water outflow regulation and quantify associated uncertainties, likely addressing climate adaptation and water resource management. It is open to research institutions and organizations partnering with the U.S. Department of Defense's Corps of Engineers.

Summary by Raise Lens from the official notice · 31 May 2026Accurate?

About this grant

The U.S. Army Corps of Engineers (USACE), through the Engineer Research and Development Center (ERDC), invites proposals to conduct a comprehensive uncertainty analysis for new outflow rating equations associated with a critical water control structure on Lake Superior. The primary focus is to enhance the accuracy and reliability of discharge measurements, which are fundamental to effective management of the Great Lakes system under the Lake Superior Regulation Plan. Task 1 (base task) addresses the fact that current operational procedures for the structure's gates include partially open settings not accounted for in historical rating equations. New rating equations are being developed by a University of Michigan team using advanced physical and computational fluid dynamics (CFD) modeling. Applicants must propose a plan to work collaboratively and integrate their efforts with this existing University of Michigan modeling team. The principal outcome will be a quantified uncertainty band for discharge rates corresponding to various gate openings and water levels, using the publicly available Large Lake Statistical Water Balance Model. This task requires a 12-month performance period. Task 2 (optional, subject to funding availability) involves the development and calibration of a high-fidelity hydrodynamic model of the St. Marys River built using the Delft3D FM suite. The model scope covers the entire St. Marys River from Point Iroquois on Lake Superior to the outlet near Detour Village on Lake Huron, including the North Channel of Lake Huron to Little Current, Ontario but excluding connections to Georgian Bay. The model must be fully three-dimensional, focus on the St. Marys Rapids, and incorporate the rating equations and uncertainty analysis from Task 1. Successful projects will deliver technically sound uncertainty metrics that can be immediately integrated into USACE operational models, contributing to improved ecological outcomes and more effective water resource management. Up to two awards are anticipated under this funding opportunity.

This grant has closed

Similar grants are open now. Pro keeps the official link on every listing, closed ones included.

Eligibility

This opportunity is restricted to non-federal partners of the Great Lakes Northern Forest Cooperative Ecosystems Studies Unit (CESU). Applicants must not have disclosures of current and pending support that would render them ineligible. Prior to award and throughout the period of performance, ERDC may request updated continuing and pending support information, which may result in discontinuation of funding. Religious organizations are entitled to compete on equal footing with secular organizations for federal financial assistance.

How it's scored

The announcement does not specify detailed evaluation criteria, scoring weightings, or panel composition. However, a key requirement for a successful proposal is a well-defined plan for the awardee to work collaboratively and integrate their efforts with the existing University of Michigan modeling team, and the ability to deliver technically sound uncertainty metrics directly applicable to new ratings and integrable into USACE operational models.

Key requirements

  • Research focus on Lake Superior outflow regulation and uncertainty quantification
  • Alignment with DOD-ERDC (U.S. Army Corps of Engineers) priorities
  • Submission by deadline 2026-07-06
  • Likely requirement for U.S.-based or U.S.-partnered institutions given DOD funding source

Funder contact

The notice names a programme contact you can speak to before applying.

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceGrants.gov
Opens4 May 2026
0
EligibilityUnited States
Org typesUniversities, research institutions, non-profits, consortia
Last verified31 May 2026

Documents to prepare

We found no document list in this listing. Usually asked for in research grants; typical only, not this funder’s list. Check the official listing.

  • Project proposal with research questions and methods
  • Budget and justification of costs
  • CVs of the principal investigator and key researchers
  • Letter of support from the host institution
  • Data management or ethics statement