Funding for Innovative Projects to Improve Cycling Infrastructure in Germany
Bundesregierung / Förderdatenbank
Funding route · no open call
- Amount
- Not stated · check listing
- Deadline
- Not stated · check listing
- Who can apply
- Local authorities, non-profits, universities and 3 more · Germany
Free accounts: 1 official link a month · Pro: every link
In context
This call is open to local authorities, non-profits and universities and 3 others, at idea and R&D stage and prototype and pilot stage. Funding is a grant. Coverage is read from the notice itself: Germany.
Summary
Federal German funding in the form of grants for innovative, primarily investive pilot projects that improve cycling infrastructure and sustainable mobility, including urban and neighbourhood mobility concepts and links to other transport modes. Eligible for municipalities and other actors in cycling promotion, with preparatory measures also funded; the funding covers up to 75% of eligible costs, or 90% for financially weak municipalities.
About this grant
The Federal Ministry supports inventive projects that make cycling safer and more attractive across Germany, with the emphasis on capital measures such as cycling infrastructure. Eligible work includes urban and neighbourhood mobility concepts, infrastructure planning, and links between cycling and other modes of transport. Preparatory work and standalone planning efforts that lay the groundwork for an infrastructure scheme can also qualify, although planning grants are only paid out if the infrastructure itself goes ahead later. Projects are expected to produce results that other places can adopt, or to offer significant new insight. Applications are open to municipalities, public institutions, nonprofit associations, universities, research bodies, engineering contractors and consortia. Each applicant must have the professional competence and capacity to deliver the work, show sound creditworthiness, and not be in insolvency proceedings or be classed as a company in difficulty under EU state-aid rules. Work must not start before approval is granted, and projects on overlapping themes may be asked to coordinate. Applications outside a formal call are judged on substantive need and the funds available. The call opens on 8 September 2026.
Full description from the source
The Federal Government funds innovative projects that improve conditions for cycling (Radverkehr) in Germany, with a focus on investive measures such as infrastructure. The programme aims to generate model projects whose results can be transferred to other locations, supporting the goal of equivalent living conditions across regions. It supports measures that improve cycling conditions, such as pioneering infrastructure, and measures that secure sustainable mobility through cycling, including urban or neighbourhood-based mobility concepts and the integration of cycling with other transport modes. Preparatory measures and standalone projects that serve as a basis for eligible infrastructure projects are also eligible, for example a networking platform for developers or standalone planning of an infrastructure project; planning grants are conditional on the infrastructure project subsequently being carried out. Projects must be expected to yield results that are transferable or of model character, with exceptions for projects offering important new insights. Funding is a non-repayable grant. Investive projects receive up to 75% of eligible total costs, or up to 90% for financially weak municipalities. Non-investive projects generally receive up to 75%, exceptionally up to 90%. Value-added tax deductible as input tax is not eligible. Projects must not begin before grant approval. Applications may be submitted within project calls with set deadlines or at any time outside a call via the Bundesamt für Logistik und Mobilität (BALM), with the Bundesministerium für Verkehr as funder and BALM as project agency. The decision on funding is discretionary within available budget, and no legal entitlement exists. Applicants are typically informed within three months of the call deadline. The guideline is in force from 1 January 2021 until 31 December 2026. Grants above EUR 500,000 are published under EU block exemption rules.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
Eligibility
Eligible applicants are all legal persons under public and private law, including municipalities, public institutions and associations. Applicants must have the necessary professional qualifications and sufficient capacity to carry out the project, and must demonstrate adequate creditworthiness. Applicants must not be in insolvency proceedings or subject to certain debt-disclosure obligations, and must not be companies in difficulty under EU state-aid rules. Projects must be financed in full considering the grant, and projects must not have started before approval. Projects on the same or similar topics may be required to cooperate. Geographic scope is nationwide within Germany.
How it's scored
The Federal Ministry decides on applications based on formal and substantive aspects. Key considerations include expected knowledge gains for cycling safety and attractiveness, the model and innovation character of the project, prospects for follow-on use (Anschlussfähigkeit), and economic efficiency. The overall assessment weighs all circumstances together. For applications outside a call, selection considers substantive need and available budget.
Key requirements
- Projects must be innovative, primarily investive measures that improve conditions for cycling in Germany
- Project should be relevant to other actors in cycling promotion
- Funding is a grant covering max 75% of eligible costs (90% for financially weak municipalities); non-investive projects generally max 75%, exceptionally 90%
Funder contact
The notice names a programme contact you can speak to before applying.
Frequently asked questions
Frequently asked questions
- Who can apply for Funding for Innovative Projects to Improve Cycling Infrastructure in Germany?
- Eligibility covers local authorities, non-profits, universities, research institutions, consortia and engineering contractors in Germany. See the eligibility criteria above for the full conditions.
Relevant sectors
How this compares
How this compares
- Compared with 44 similar grants (infrastructure in Germany) listed in the last 12 months.
- Similar grants that state a value range from $3k to $11m, with a median of $110k (15 grants).
- The same organisation listed 44 other similar grants here in the last 12 months.
Closest open grants
- Funding for Transfer Facilities and Stop Infrastructure in Public Local Passenger Transport (ÖPNV)
- Funding for Studies on the Digital Automatic Coupler (DAK) – Module 3 (PioDAK)
- Funding for Intermodal Logistics Hubs to Strengthen SMEs in the Logistics and Transport Sector
- Funding for Structural Development Projects in the Lusatian Lignite Region
- Funding for Sustainable, Multimodal Urban and Commuter Mobility under the ERDF/JTF Programme 2021–2027 (ERDF Mobility Guideline)
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this listing. Usually asked for in capital grants; typical only, not this funder’s list. Check the official listing.
- Project plan with timeline and milestones
- Quotes or cost estimates for the works or equipment
- Proof of ownership, lease or permission for the site
- Planning permission or permits, where needed
- Evidence of match funding
- Latest annual accounts