01; SBW-St; Construction - B21589 - M7 bridge timber replacement, Donaukanal bridge (M20)
Original: 01; SBW-St; Bau - B21589 - M7 Brückenhölzertausch Donaukanalbrücke (M20)
ÖBB-Infrastruktur AG
- Value
- Not stated · check listing
- Closes
- 18 Dec 2026
- Where
- Austria
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 1 Dec. This page is open to everyone now.
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Austria (Vienna). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
ÖBB-Infrastruktur AG is procuring the replacement of timber bridge decking, rails and ballasted track on the two-track steel-arch Donaukanal bridge in Vienna, about 108 m long, including the adjacent vaulted-bridge approaches. It suits an established railway civil-engineering contractor with rail-bridge experience rather than a sustainability-focused startup.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Die Ausschreibung beinhaltet die Herstellung der beiden Gleise (FFU Brückenhölzer mit Fahr- und Sicherheitsschienen) im Bereich der bestehenden zweigleisigen Stahlbogenbrücke über den Donaukanal einschließlich der Herstellung der Hechte auf den beiden unmittelbar angrenzenden Gewölbebrücken über die Dampfschiffstraße und die Schüttelstraße mit Schotteroberbau der ÖBB-Strecke 12201 Wien Hütteldorf (in Hf) – Wien Praterstern (in Nw), Schnellbahn Wien Stammstrecke, Abschnitt „Wien Mitte – Praterstern“, Bahn-km 5,200 bis Bahn km 6,463 in Wien.Die Arbeiten umfassen außerdem den Einbau von Balisen, der gesamten Bedielung (FFUKonstruktionen) sowie der Durchtrittsbleche im Bereich der Stahlbogenbrücke.Die Gesamtlänge des zu erneuernden zweigleisigen Abschnitts beträgt ca. 108 m. Die Eisenbahnbrücke (Stahlbogentragwerk) über den Donaukanal verbindet den 3. mit dem 2. WienerGemeindebezirk und überquert neben dem Donaukanal auch die Weißgerberlände sowie die beiden Treppelwege (Hundertwasser-Promenade und Emilie-Turecek-Promenade).
Key requirements
- Replace bridge timbers (FFU) with running and guard rails on the two tracks over the Donaukanal steel-arch bridge
- Build track ladders on the adjacent vaulted bridges and ballasted track over about 108 m, Bahn-km 5.200 to 6.463
- Install balises, full deck planking and passage plates on the steel-arch bridge
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)