GMCA 2171 Strategic Environmental Assessment Tender
Greater Manchester Combined Authority
- Value
- £100K
- Closes
- Not stated · check listing
- Where
- United Kingdom
- Contract
- Consulting · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering consulting. Delivery covers United Kingdom (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The Greater Manchester Combined Authority is seeking a consultant to prepare the Strategic Environmental Assessment for the Greater Manchester Joint Minerals and Waste Plan, including scoping, consultation and the Environmental Report. A specialist environmental planning consultancy or SME with SEA and plan-making experience would fit this roughly £100K commission.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Greater Manchester Combined Authority is running an expression of interest for a Strategic Environmental Assessment (SEA) to support the forthcoming Greater Manchester Joint Minerals and Waste Plan (GMJMWP). The plan will be a single document replacing the existing Minerals Plan (adopted 2013) and Waste Plan (adopted 2012). The ten participating authorities are Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford and Wigan. The plan will be developed in partnership with the local authorities and a specialist third-party provider, under the Town and Country Planning (Local Planning) (England) Regulations 2026. The SEA must identify the environmental effects of implementing the plan and any reasonable alternatives. The proposed commission covers: the SEA for the GMJMWP; preparation and consultation on the scope and level of detail of the SEA Environmental Report, run alongside consultation on the proposed minerals and waste plan content and evidence; preparation and consultation on the proposed SEA Environmental Report, run alongside consultation on the plan; and review and finalisation of the SEA Environmental Report before 'Gateway 3'. The timetable is to be agreed. Under the transitional arrangements in the 2026 Regulations, the authorities must give notice of commencement of plan making before 31 December 2026 and pass Gateway 1 by 30 April 2027. The overall contract duration is not stated on the page.
Key requirements
- Prepare the Strategic Environmental Assessment for the Greater Manchester Joint Minerals and Waste Plan
- Lead scope and level-of-detail consultation alongside plan consultation
- Produce and consult on the SEA Environmental Report and finalise it before Gateway 3
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)