A12 Natural Hazard Measures Upper Inn Valley - Landscaping Works
Original: A12 DIV Naturgefahren Oberland mittelfristige Maßnahmen - Landschaftsbauarbeiten
Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft
- Value
- Not stated · check listing
- Closes
- 15 Jan 2027
- Where
- Austria
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 1 Dec. This page is open to everyone now.
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Austria (Tyrol). It is classified under Climate Adaptation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This ASFINAG tender procures landscaping and recultivation works after civil engineering that secures three natural-hazard sites (debris basins and rockfall nets) along the A12 Inntal motorway in Tyrol, expected for winter 2026/2027. It suits a landscaping or civil contractor with alpine slope and erosion-control experience, likely as a subcontractor or SME-scale lot.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft (ASFINAG) is procuring landscaping works (Landschaftsbauarbeiten) on the A12 Inntal Autobahn in the Tyrolean Oberland, between km 119.0 and km 126.0. The works reduce the hazard to the road structure at three hazard sites through structural interventions. The tender covers the restoration and recultivation work that follows completion of the civil engineering works. The three hazard sites are: the Murbecken Schlenzenmure debris basin at motorway km 119.160–119.310; the Steilnetzsperre slope-net barrier at km 120.350–120.720; and the Geschiebebecken Bergtalmure sediment basin at km 126.150. They are combined into a single tender. The civil works are expected to take place in winter 2026/2027. The page does not state the contract duration or the detailed deliverables.
Key requirements
- Landscaping and recultivation works following completion of civil engineering at three hazard sites
- Sites: Schlenzenmure debris basin (km 119.160-119.310), steep-slope net barrier (km 120.350-120.720), Bergtalmure debris basin (km 126.150)
- Works expected winter 2026/2027; bids close 15 January 2027
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)