Skip to content
Raise Lens
Tender · TED (EU)

Anti-seepage protection of embankment body and subsoil, right Wisłoka levee, Mielec

Original: Flood-prevention works – „Zabezpieczenie przeciwfiltracyjne korpusu lokalnie i podłoża na całej długości na prawym wale rzeki Wisłoki w km rzeki 21+300- 27+900 w msc. Mielec”

Value
Not stated · check listing
Closes
1 Dec 2026
 
Where
Poland
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 17 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 14 Nov 202617 days to prepare
Found today · 26 Nov 20265 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Poland (Europe). It is classified under Climate Adaptation, Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Wody Polskie is procuring the second phase of works to seal the body and subsoil of the right-bank Wisłoka flood embankment along 6.6 km in Mielec, including earthworks, drainage culverts, a flood access road, and related infrastructure repairs. Suited to experienced hydro-engineering contractors with flood-defence works track record, or to specialist SMEs able to subcontract seepage-control and earthworks packages.

Summary by Raise Lens from the official notice · 18 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The buyer, Państwowe Gospodarstwo Wodne Wody Polskie, is procuring the second part of construction works under the task "Zabezpieczenie przeciwfiltracyjne korpusu lokalnie i podłoża na całej długości na prawym wale rzeki Wisłoki w km rzeki 21+300-27+900 w msc. Mielec" (anti-seepage protection of the embankment body and subsoil along the full length of the right flood embankment of the Wisłoka river, river km 21+300 to 27+900, in Mielec). The scope covers flood-protection works in three groups. Main works include: preparatory works; earthworks; anti-seepage protection of the embankment subsoil; anti-seepage protection of the embankment body; reconstruction of embankment culverts; construction of culverts on drainage ditches under the green strip; construction of a flood access road; and finishing works. Accompanying works include: protection of technical infrastructure running under the embankment; replacement plantings; and repair of public roads. The detailed specification and the conditions of performance are set out in the attachments to the SWZ (Polish tender documentation). The contract duration is not stated on the notice page.

Key requirements

  • Anti-seepage works on embankment body and subsoil over 21+300 to 27+900 km of the Wisłoka right levee
  • Earthworks, culvert reconstruction, new drainage culverts, and a flood access road
  • Relocation or protection of underground infrastructure and restoration of public roads and replacement plantings

CPV codes

Relevant sectors

How this compares

About this sector

Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published13 Nov 2026
Closes1 Dec 2026, 00:00 UTC
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryPoland
RegionEurope
CurrencyPLN
Last verified18 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)