Appointment of Integrated Design Team for Cork University Business School New Building
University College Cork
- Value
- €2.5M
- Closes
- 21 Dec 2026
- Where
- Ireland
- Contract
- Services · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 27 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering services. Bids are invited through a restricted procedure. Delivery covers Ireland and the European Union (Europe). It is classified under Sustainable Buildings and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
University College Cork is procuring an integrated design team, led by an architect, for the new Cork University Business School building, including an Energy Efficient Design Co-Ordinator role. It suits established multidisciplinary architecture and engineering consultancies rather than small early-stage firms.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
University College Cork is procuring an Integrated Design Team to provide consultancy services for the delivery of the new Cork University Business School (CUBS) building on Perrott's Avenue. The procurement uses a two-stage restricted procedure under Directive 2014/24/EU (classic), classed as a public works-related services contract. The design team will be appointed on an integrated basis, with the Architect acting as integrated design team lead. The principal service providers required in the integrated team are: Architectural Services; Civil and Structural Engineering Services; Mechanical and Electrical Engineering Services; Project Supervisor Design Process (PSDP); and Energy Efficient Design Co-Ordinator (EED). Quantity Surveying Services are excluded from this competition and will be procured separately. The contract duration is 60 months, including any options and renewals. The estimated value is EUR 2,500,000. Tenders must remain valid for 180 days.
How bids are scored
Evaluation mechanism is Most Economically Advantageous Tender (MEAT). No price/quality split or individual weightings are disclosed on the page.
Key requirements
- Integrated design team led by the architect, covering architecture, civil and structural, MEP, PSDP and energy-efficient design coordination
- Two-stage restricted procedure for the new CUBS building on Perrott's Avenue, Cork
- Energy Efficient Design Co-Ordinator role required; quantity surveying procured separately
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)