This tender closed on 15 September 2026. The deadline passed 72 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Architectural and engineering planning services for Zoocampus Schwerin
Original: Architectural, construction, engineering and inspection services – Planungsleistungen für den "Zoocampus" in Schwerin für die Zoologischer Garten Schwerin gGmbH
Zoologischer Garten Schwerin GGmbH
- Value
- Not stated · check listing
- Closes
- 15 Sep 2026Closing date passed
- Where
- Germany
- Contract
- Services · Corporate
In context
This is a contract notice published by a corporate buyer covering services. Delivery covers Germany (Europe). It is classified under Sustainable Buildings, Energy Efficiency and Circular Economy and 1 other against the sustainability taxonomy rather than matched on keywords.
Summary
Procurement of architectural and engineering planning services (HOAI §55-56) for a zoo campus renovation in Schwerin, Germany, with explicit focus on circular-economy energy systems, decentralized HVAC, passive cooling, and resource efficiency. Bidders must be qualified planning engineers/architects with expertise in sustainable building systems, renewable energy integration, and low-impact mechanical design.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Procurement of specialized planning services (Fachplanungsleistungen) according to HOAI §§55, 56 for the 'Zoocampus' project at Zoologischer Garten Schwerin. The scope includes building services planning (Gebäudetechnikplanung) with particular emphasis on coordinating energy generation in the circular economy context with building energy requirements, prioritizing maximum self-supply and resource utilization. The project adopts a resource-conserving approach, avoiding floor space consumption from large-format ventilation ducts by preferring decentralized ventilation systems (e.g., per floor in administration areas). Summer heat protection shall employ passive cooling methods where feasible.
Key requirements
- HOAI §55-56 qualified planning services (architecture, building systems, engineering, inspection)
- Energy system design prioritizing on-site renewable generation and circular-economy resource recovery
- Decentralized ventilation design (per-floor units preferred) to minimize ductwork footprint
- Passive cooling strategies for summer thermal comfort; minimize active cooling demand
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)