This tender closed on 3 July 2026. The deadline passed 146 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Architectural design services – Stadt Dorfen – comprehensive swimming pool renovation
Original: Architectural design services – Stadt Dorfen - Generalsanierung des Freibads
Planungsverband Äußerer Wirtschaftsraum München
- Value
- Not stated · check listing
- Closes
- 3 Jul 2026Closing date passed
- Where
- Germany
- Contract
- Services · Government
In context
This is a contract notice published by a government body covering services. Delivery covers Germany and the European Union (Europe). It is classified under Sustainable Buildings, Energy Efficiency and Climate Adaptation against the sustainability taxonomy rather than matched on keywords.
Summary
City of Dorfen seeks architectural design services for comprehensive renovation of a 1964 public outdoor swimming pool, including modernization for climate protection, accessibility, and technical upgrades. Bidders must be licensed architecture or engineering firms with swimming pool sector experience and sufficient capacity to deliver design planning by end-2026.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Stadt Dorfen intends to comprehensively renovate (Generalsanierung) its public open-air swimming pool (Freibad), originally opened in 1964 and last renovated in 2008. The facility covers 13,152 m² with a large swimming basin (1,340 m²) and children's pool (137 m²). The renovation will modernize the facility to meet current standards including climate protection, accessibility, and technical infrastructure. The existing large pool will be subdivided into swimmer and non-swimmer zones and supplemented with a warm water pool. The existing entrance hall will be replaced with a new building. The service sought is architectural design services covering design planning phase (LPH 3 Entwurfsplanung) to be completed by end of 2026 to support a funding application.
Bidder eligibility
Architectural offices or engineering firms with building authorization (Architektur- oder bauvorlagenberechtigte Ingenieurbüros) with documented experience in swimming pool projects and sufficient capacity to complete the design planning phase within the specified timeline.
Key requirements
- Licensed architecture or engineering firm with building-design authority (Bauvorlagenberecht)
- Demonstrated experience in swimming pool design and renovation projects
- Sufficient capacity to deliver design planning (LPH 3 Entwurfsplanung) by end-2026
- Expertise in climate protection, barrier-free accessibility, and modern technical systems
- Understanding of synergies with adjacent sports facilities and primary school
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)