Skip to content
Raise Lens
Tender · TED (EU)Closed

Architectural, engineering and planning services – sewer rehabilitation closed-pipe method

Original: Architectural, engineering and planning services – Planung und ingenieurmäßige Begleitung einer Kanalsanierung in geschlossener Bauweise

Stadt Schwäbisch Gmünd - Eigenbetrieb Stadtentwässerung

Value
€1.5M
Closes
22 Sep 2026Closing date passed
Where
Germany
Contract
Services · Utility

In context

This is a contract notice published by a utility covering services. Delivery covers Germany (Europe). It is classified under Sustainable Buildings and Water against the sustainability taxonomy rather than matched on keywords.

Summary

City of Schwäbisch Gmünd seeks architectural and engineering services for planning and supervision of a closed-pipe sewer rehabilitation project in the Lindach district, covering 3,000 m of inline-lining work plus robotic repairs on a €1.5M budget. Bidders should be experienced in wastewater infrastructure design, project management, and trenchless sewer rehabilitation techniques.

Summary by Raise Lens from the official notice · 22 Sept 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

The City of Schwäbisch Gmünd, Department of Municipal Drainage (Eigenbetrieb Stadtentwässerung), is planning sewer rehabilitation work in the Lindach district. Based on an existing rehabilitation concept, the project involves procuring sewer internal rehabilitation services and overseeing the rehabilitation work. The total sewer network in Lindach covers 21,200 m of combined sewers, with approximately 3,000 m of sewers to be rehabilitated using the inline (cured-in-place pipe) method for pipe section ZK 0-1(2), plus various robot-assisted rehabilitation measures. The project is estimated to cost approximately €1.5 million in construction costs. The required planning phases are 1-3, 5-8 (and optionally 9). Planning is to commence in autumn 2026, with preliminary planning completion for decision-making scheduled for March 2027.

Key requirements

  • Planning phases 1–3, 5–8 (9) for sewer rehabilitation project
  • Supervision and oversight of 3,000 m inline-lining works plus robotic repairs
  • Preliminary design completion by March 2027 for decision-making
  • Experience with trenchless sewer rehabilitation (CIPP/inline-lining) techniques
  • Project cost estimation and budget management (~€1.5M construction budget)

CPV codes

How this compares

About this sector

Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceTED (EU)
Published20 Aug 2026
Closes22 Sep 2026, 23:59 UTC
Buyer typeUtility
TypeServices
DeliveryOn-site, Hybrid
CountryGermany
RegionEurope
CurrencyEUR
Budget range€1.5M
Last verified22 Sep 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)