Architectural, engineering documentation and site supervision for Nowa Wyzwolenia street construction, Gdańsk
Original: Architectural, construction, engineering and inspection services – Opracowanie dokumentacji projektowej wraz z pełnieniem nadzoru autorskiego dla zadania pn. „Budowa ul. Nowej Wyzwolenia w Gdańsku”
Dyrekcja Rozbudowy Miasta Gdańska działająca w imieniu i na rzecz Gminy Miasta Gdańska
- Value
- Not stated · check listing
- Closes
- 5 Oct 2026Closing date passed
- Where
- Poland
- Contract
- Services · Government
In context
This is a contract notice published by a government body covering services. Delivery covers Poland and the European Union (Europe). It is classified under Sustainable Buildings, Water and Biodiversity and Nature and 1 other against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures architectural, engineering, and design documentation plus site supervision for a major street infrastructure project (Nowa Wyzwolenia) in Gdańsk, Poland, including drainage systems, green infrastructure, utility coordination, and environmental compliance. Bidders should be multidisciplinary engineering/architecture firms with experience in complex urban infrastructure, environmental assessment, and Polish administrative approval processes.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Procurement for architectural, engineering, and construction documentation services with author's supervision for the investment project of building Nowa Wyzwolenia Street in Gdańsk. The scope includes: (1) Basic Scope – preparation of construction design documentation covering two functional sections (eastern and western segments) with phased implementation, including street construction, intersection reconstruction, engineering structures over Warzywód II stream, road drainage systems, retention devices, rain pump station, demolition of part of allotment gardens, soil contamination surveys, street lighting, coordination with underground/above-ground utilities, landscaping design and protection, tree inventory management, replacement planting design, and obtaining necessary administrative decisions and building permits (ZRID); (2) Option Scope – preparation and approval of remediation plan if contamination is found. Duration: project documentation and author's supervision through completion of administrative approvals and building permits.
Bidder eligibility
Bidders must meet Polish public procurement law requirements under the Public Procurement Law (Prawo zamówień publicznych) of 11 September 2019. Specific technical qualifications, professional registrations, and prior relevant experience in similar architectural and engineering projects for municipal infrastructure are required. Detailed eligibility requirements are specified in the Specification of Requirements (SWZ – Specyfikacja Warunków Zamówienia), Attachment 8.
How bids are scored
Evaluation criteria are specified in the Specification of Requirements (SWZ), Attachment 8, and Draft Contract Terms (Projektowane postanowienia umowy), Attachment 9. Specific scoring weightings and price-to-quality evaluation methodology are detailed in those documents.
Lots
- Lot 1: Zakres nr 1 – PODSTAWOWY (Basic Scope)
Preparation of construction design documentation covering two functional sections: Eastern Section (Stage I) including street construction, intersection reconstruction, engineering structure over Warzywód II stream, drainage systems, retention devices, pump station, allotment garden demolition, soil contamination surveys, street lighting, utility coordination, landscaping design and protection, tree inventory management, and obtaining construction permits and administrative decisions; Western Section (Stage II) with similar scope.
- Lot 2: Zakres nr 2 – OPCJA (Option Scope)
Preparation and approval of remediation project plan in case of contamination discovery for Stage I and Stage II, subject to buyer's discretion. Buyer may issue order to commence within 21 days of first deliverable acceptance.
Key requirements
- Design documentation for street construction with two functional sections and phased implementation
- Integrated drainage systems, stormwater retention, and pumping station design
- Green infrastructure planning, tree inventory, replacement planting, and ecological protection measures
- Utility conflict resolution (underground and above-ground networks)
- Obtaining building permits and construction notifications (ZRID) and administrative approvals
- Site supervision and author's oversight throughout construction
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)