Backup cooling towers and HVAC adaptation, buildings S-2 and S-3, Seville 2026 Tender
Original: Instalación de torres de enfriamiento de respaldo y adaptación de instalaciones HVAC de los edificios S-2 y S-3 en C/Américo Vespucio, 15 y 13 respectivamente, de Sevilla.
Empresa Pública de Gestión de Activos, S.A. M.P.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Spain and the European Union (Europe). It is classified under Heating and Cooling, Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Installation of backup cooling towers and HVAC system adaptation for two office buildings in Seville, Spain. Bidders should have HVAC retrofit and cooling-system installation expertise, ideally with experience in energy-efficiency upgrades for commercial real estate.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contracting authority, Empresa Pública de Gestión de Activos, S.A. M.P. (EPGASA), is procuring public works for the installation of backup cooling towers and the adaptation of the HVAC installations in buildings S-2 and S-3, located at C/Américo Vespucio 15 and 13 respectively, in Seville (NUTS ES618). The contract is classified under CPV 45331000-6 (heating, ventilation and air-conditioning installation work). It is not divided into lots. The tender is processed through an open procedure under the ordinary process, with electronic submission only. The estimated duration of the works is 6 months. The contractor must carry out, for the offered price, all work needed for full compliance with the contract's purpose, to the satisfaction of EPGASA. The contract price is fixed and may not be increased or revised during its term. The technical specifications are set out in the Pliego de Prescripciones Técnicas (PPT, "PPT TORRES ENFRIAMIENTO"), and the administrative conditions are set out in the Pliego de Cláusulas Administrativas Particulares (PCAP, "PCAP TORRES ENFRIAMIENTO"), both published on 23/10/2026. A Memoria Justificativa and the Acuerdo de Inicio are also published in the file.
Bidder eligibility
Minimum contractor requirements are those established in the PCAP, which are not reproduced on the notice page. Selection criteria for candidates and any special award conditions are likewise delegated to the PCAP. Social clauses include labour-sector obligations and fiscal transparency requirements.
How bids are scored
Award criteria are those established in the PCAP. No price/quality split or weightings are disclosed on the notice page. Special award conditions are also set out in the PCAP.
Key requirements
- ✓Installation of backup cooling towers for buildings S-2 and S-3
- ✓HVAC system adaptation and retrofit work
- ✓Compliance with Spanish building and mechanical standards
- ✓Work at two addresses in Seville (C/Américo Vespucio 15 and 13)
CPV codes
Relevant sectors
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →