Skip to content
Raise Lens
Tender · TED (EU)Closed

Biomass installation modernization 7.4 MW: water-flue gas economizer design, supply, installation

Original: Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery – MODERNIZACJA INSTALACJI BIOMASOWEJ 7,4 MW -WYKONANIE/DOSTAWA I MONTAŻ EKONOMIZERA WODA – SPALINY W ZESPOLE KOTŁOWNI MILENIUM W NOWYM SĄCZU

Miejskie Przedsiębiorstwo Energetyki Cieplnej Spółka z ograniczoną odpowiedzialnością w Nowym Sączu

Value
Not stated · check listing
Closes
21 Jul 2026Closing date passed
Where
Poland
Contract
Mixed · Utility

In context

This is a contract notice published by a utility covering a mix of works, supplies and services. Bids are invited through an open procedure. Delivery covers Poland and the European Union (Europe). It is classified under Heating and Cooling, Renewable Energy and Energy Efficiency against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures design, supply, installation, and commissioning of a condensing economizer (water-flue gas heat exchanger) for a 7 MW biomass boiler in Poland. Bidders should have expertise in heat-recovery equipment, biomass heating systems, and industrial HVAC retrofit.

Summary by Raise Lens from the official notice · 2 Jul 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

The subject of the contract is the design, manufacture, supply, installation, and commissioning of a condensing flue gas–water economizer for an existing biomass boiler with a nominal output of 7 MW, located at the Milenium Boiler Plant in Nowy Sącz, Poland. The project is titled 'Modernisation of the 7.4 MW Biomass Installation – Design/Supply and Installation of a Water–Flue Gas Economizer at the Milenium Boiler Plant in Nowy Sącz.' The scope covers the full lifecycle from engineering design through to final start-up and commissioning of the condensing economizer unit integrated with the existing biomass boiler system. Detailed technical requirements are contained in the procurement documents.

Key requirements

  • Design and manufacture condensing economizer (water-flue gas heat exchanger) for 7 MW biomass boiler
  • Supply, installation, and commissioning of equipment at Milenium boiler plant in Nowy Sącz
  • Integration with existing biomass heating infrastructure

CPV codes

How this compares

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceTED (EU)
Published22 Jun 2026
Closes21 Jul 2026, 00:00 UTC
Buyer typeUtility
TypeMixed
MethodOpen
DeliveryOn-site
CountryPoland
RegionEurope
Last verified2 Jul 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)