Skip to content
Raise Lens
Tender · TED (EU)Closed

Biomass installation modernization 7.4 MW: water-flue gas economizer design, supply, installation

Original: Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery – MODERNIZACJA INSTALACJI BIOMASOWEJ 7,4 MW -WYKONANIE/DOSTAWA I MONTAŻ EKONOMIZERA WODA – SPALINY W ZESPOLE KOTŁOWNI MILENIUM W NOWYM SĄCZU

Miejskie Przedsiębiorstwo Energetyki Cieplnej Spółka z ograniczoną odpowiedzialnością w Nowym Sączu

Value
Not stated · check listing
Closes
9 Jun 2026Closing date passed
Where
Poland
Contract
Mixed · Utility

In context

This is a contract notice published by a utility covering a mix of works, supplies and services. Bids are invited through an open procedure. Delivery covers Poland and the European Union (Europe). It is classified under Heating and Cooling, Energy Efficiency and Renewable Energy against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures design, supply, delivery, and installation of a condensing water-flue gas economizer for a 7 MW biomass boiler at a district heating plant in Poland. Bidders should have expertise in heat-exchanger engineering, biomass installation retrofit, and industrial HVAC systems.

Summary by Raise Lens from the official notice · 14 May 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

„MODERNIZACJA INSTALACJI BIOMASOWEJ 7,4 MW - WYKONANIE/DOSTAWA I MONTAŻ EKONOMIZERA WODA – SPALINY W ZESPOLE KOTŁOWNI MILENIUM W NOWYM SĄCZU” Przedmiotem zamówienia jest zaprojektowanie, wykonanie, dostawa, montaż oraz uruchomienie ekonomizera kondensacyjnego typu spaliny–woda dla istniejącego kotła biomasowego o mocy nominalnej 7 MW, zlokalizowanego na terenie Kotłowni Milenium w Nowym Sączu. Szczegółowy opis przedmiotu zamówienia został zawarty w dokumentach postępowania.

Key requirements

  • Design and engineering of condensing economizer (water-flue gas type) for existing 7 MW biomass boiler
  • Supply, delivery, and installation at Milenium boiler plant in Nowy Sącz
  • System commissioning and startup
  • Integration with existing biomass heating infrastructure

CPV codes

How this compares

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceTED (EU)
Published7 May 2026
Closes9 Jun 2026
Buyer typeUtility
TypeMixed
MethodOpen
DeliveryOn-site
CountryPoland
RegionEurope
Last verified14 May 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)