This tender closed on 18 September 2026. The deadline passed 68 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Supply of biomethane to GIZ GmbH sites in Germany 2026 Tender
Original: Lieferung von Biomethan an Standorte der GIZ GmbH in Deutschland
- Value
- Not stated · check listing
- Closes
- 18 Sep 2026Closing date passed
- Where
- Germany
- Contract
- Supplies · Government
In context
This is a contract notice published by a government body covering the supply of goods. Delivery covers Germany and the European Union (Europe). It is classified under Renewable Energy and Methane and Super Pollutants against the sustainability taxonomy rather than matched on keywords.
Summary
Procurement of approximately 9,200 MWh of biomethane to supply multiple GIZ offices across Germany over 2 years. Bidders must be renewable gas producers or certified biomethane suppliers with delivery infrastructure to German sites.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Supply of biomethane to Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH locations in Germany. The tender includes delivery of biomethane to multiple GIZ sites with monthly consumption data provided for reference. Contract terms and conditions are specified in the attached biomethane supply agreement (Entwurf_GIZ_Biomethanbezugsvertrag). The procurement follows the open procedure (Offenes Verfahren) under VgV regulations.
Bidder eligibility
Bidders must comply with VgV (Vergabe- und Vertragsordnung für Leistungen) regulations. Requirements include: declaration on exclusion grounds and suitability (Eigenerklaerung zu Ausschlussgruenden und Eignung), compliance with EU-Russia sanctions 2024, and if applicable, declarations regarding consortia/joint ventures (Bietergemeinschaft) and subcontractors. General GIZ procurement conditions (Allgemeine Einkaufsbedingungen GIZ 2023) apply.
How bids are scored
Not specified in provided document extract. Detailed evaluation criteria would be contained in the tender documents (Vergabeunterlagen), specifically in the performance specification (Leistungsbeschreibung-Biomethan.pdf) and conditions documents.
Key requirements
- Supply of 9,200 MWh biomethane over 2-year period
- Delivery to multiple GIZ locations within Germany
- Certified renewable gas producer or authorized biomethane supplier
- Compliance with German and EU renewable energy standards
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)