Boilers – Construction, supply and commissioning of biomass boiler K2 2026 Tender

Original: Boilers – Výstavba, dodávka a uvedení do provozu biomasového kotle K2

Environmental Energy, s.r.o.

In context

This is a contract notice published by a corporate buyer covering construction and works. Delivery covers Czechia (Europe). It is classified under Renewable Energy, Heating and Cooling and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Design, supply, construction and commissioning of a 2.5 MWt biomass boiler (K2) with fuel storage, ash management, flue-gas cleaning and integration into an existing district heating and cogeneration centre. Bidders must be engineering/manufacturing firms capable of biomass boiler design, fabrication, installation and system integration.

Summary by Raise Lens from the official notice · 18 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Environmental Energy, s.r.o. is procuring the design, supply, construction, installation and commissioning of a new biomass boiler, designated K2, with a thermal output of 2.5 MWt. The site is the KEC energy centre within the Žďárského industrial zone in Kožichovice-Třebíč, Czech Republic. The scope includes the design proposal, manufacture, assembly and commissioning of the boiler, together with a fuel storage bunker, ash handling, flue gas cleaning, connection to existing distribution systems, and a control system. It also covers the building work for the new K2 plant, including the cladding of the building. The internal K2 switchgear room is to be placed outside the main building but structurally separated from the operating area, to protect against dust, temperature and hygiene risks. The design must account for connection to the district heating network (CZT) and for coordination with the existing cogeneration centre, the K1 biomass boiler and the heat pumps. The page does not state the contract duration.

Key requirements

  • ✓Design and engineering of 2.5 MWt biomass boiler system with thermal output specification
  • ✓Supply, manufacture, assembly and commissioning of boiler K2 with fuel storage and ash-handling systems
  • ✓Flue-gas cleaning and emissions control integration
  • ✓Connection to existing district heating network and coordination with cogeneration centre, biomass boiler K1 and heat pumps
  • ✓Building envelope and control-room construction (separate dust/temperature/hygiene-protected switchroom)
  • ✓Project design proposal and full system integration

Relevant sectors

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.