This tender closed on 17 September 2026. The deadline passed 69 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Caribbean, Design, Supply, Installation and Commissioning of Grid-connected in lots: Lot 1-Energy Efficiency Measures in 13 Government Buildings in Guyana Lot 2- Renewable Energy (Solar Photo…
Guyana Energy Agency
- Value
- Not stated · check listing
- Closes
- 17 Sep 2026Closing date passed
- Where
- Guyana, Latin America
- Contract
- Mixed · Multilateral
In context
This is a contract notice published by a multilateral institution covering a mix of works, supplies and services. Bids are invited through an open procedure. Delivery covers Guyana and Latin America. It is classified under Energy Efficiency, Renewable Energy and Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures design, supply, installation and commissioning of energy-efficiency retrofits and grid-connected solar PV systems across 13 government buildings in Guyana, split into two lots. Bidders should have expertise in building energy audits, renewable energy system design, and installation capabilities in Caribbean jurisdictions.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Design, supply, installation and commissioning of grid-connected energy efficiency measures and renewable energy (solar photovoltaic) systems across 13 government buildings in Guyana. The project is structured in two lots: Lot 1 covers energy efficiency measures in the 13 buildings, and Lot 2 covers solar photovoltaic system installations in the same 13 buildings. Both lots involve complete design through commissioning phases.
Lots
- Lot 1: Energy Efficiency Measures in 13 Government Buildings in Guyana
Design, supply, installation and commissioning of energy efficiency measures across 13 government buildings
- Lot 2: Renewable Energy (Solar Photovoltaic Systems) in 13 Government Buildings in Guyana
Design, supply, installation and commissioning of grid-connected solar photovoltaic systems across 13 government buildings
Key requirements
- Design and supply of energy-efficiency measures for 13 government buildings
- Design, supply, installation and commissioning of grid-connected solar PV systems
- Lot-based procurement structure allowing partial bidding
- Caribbean/Guyana operational capability and local delivery capacity
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)