Citizen campus City of Ahlen, renovation of city library, demolition works
Original: Demolition work – Bürgercampus Stadt Ahlen, Sanierung der Stadtbücherei, Abbrucharbeiten
Stadt Ahlen, Der Bürgermeister
- Value
- Not stated · check listing
- Closes
- 22 Dec 2026
- Where
- Germany
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 28 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Germany and the European Union (Europe). It is classified under Waste Reduction against the sustainability taxonomy rather than matched on keywords.
Summary
The City of Ahlen is tendering demolition works for the renovation of its city library within the Bürgercampus, including removal of asbestos and KMF insulation, textile flooring, screed, ceilings, plaster, and building services and elevator/sprinkler dismantling. Local demolition and hazardous-materials contractors with German licensing and waste-disposal capacity are the best fit.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Stadt Ahlen (Der Bürgermeister) is procuring demolition and decontamination works (Abbrucharbeiten) as part of the renovation of the Stadtbücherei (public library) within the Bürgercampus Stadt Ahlen. The main positions listed are: removal of hazardous building materials, including disposal of KMF (mineral fibre) insulation and suspended ceiling (ca. 2,000 m2); removal of textile floor covering (ca. 2,100 m2); removal of screed (ca. 600 m2); removal of asbestos-containing building materials (ca. 3,200 m2); removal of KMF insulation from walls (ca. 3,200 m2); chiselling off interior plaster (ca. 350 m2); removal of mineral wool (MW) (ca. 250 m2). The scope also covers dismantling of technical building services (TGA, including HLSE), removal of the sprinkler system including its piping, and removal of the existing elevator installation. The page excerpt does not state the contract duration, phasing, or delivery milestones.
Key requirements
- Removal and certified disposal of asbestos-containing materials and KMF mineral fibre insulation
- Demolition of textile flooring, screed, suspended ceilings, interior plaster and masonry (approx. 2,000 to 3,200 m2 per item)
- Dismantling of HVAC, sprinkler system with piping, and existing elevator installation
Relevant sectors
How this compares
About this sector
About this sector
Waste reduction funding covers prevention, collection, sorting, recycling and recovery of municipal, commercial and industrial waste. Much of the activity is public procurement by local and regional authorities, alongside grants for new treatment technology. Bidders are typically assessed on service capacity, environmental permits and track record with comparable contracts.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)