City Hall RTU Replacement 2027 Tender
City of Flin Flon
- Value
- Not stated · check listing
- Closes
- 24 Jan 2027
- Where
- Canada
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Canada (NORTH-AMERICA). It is classified under Energy Efficiency against the sustainability taxonomy rather than matched on keywords.
Summary
The City of Flin Flon is procuring the removal, supply, installation, and commissioning of an energy-efficient two-stage rooftop HVAC unit with ductwork, curb, and controls work for the City Hall Council Chambers. It suits local or regional HVAC contractors capable of single-site rooftop mechanical installation and commissioning.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The City of Flin Flon is seeking qualified HVAC contractors to supply, install, and commission a new energy-efficient rooftop HVAC unit (RTU) serving the Council Chambers at City Hall in Flin Flon, Manitoba. The unit replaces the existing Carrier rooftop unit (Model 50DP014100 GC, Serial No. 4U458). The replacement unit must provide ventilation, tempered incoming outdoor air, and cooling for the Council Chambers, and must include two-stage cooling and sufficient heating capacity to temper incoming outdoor air in cold weather. Full space heating is not required, because the Council Chambers are currently heated by electric baseboard heaters. Scope includes removal and disposal of the existing unit, supply and installation of the replacement RTU, ductwork and rooftop curb modifications, new control wiring and associated controls, and system testing, balancing, and commissioning. The notice lists an estimated contract period of 0 months with a proposed start date of 2027-01-25. The duration figure appears incomplete, so the actual project timeline should be confirmed with the buyer.
Bidder eligibility
Not explicitly stated on the notice. The procurement is open to qualified HVAC contractors and is subject to the Canadian Free Trade Agreement (CFTA). Bidders may need an account on the third-party MERX platform to view or bid, and the notice refers to SAP Ariba registration for bidding support. Specific licensing, certifications, references, or financial thresholds are not disclosed on this page and should be checked in the full solicitation documents.
How bids are scored
Not disclosed on the notice. Procurement method is listed as Competitive – Open Bidding. No price/quality split or scoring weights are shown.
Key requirements
- Remove and dispose of the existing Carrier rooftop unit and replace it with a new energy-efficient RTU with two-stage cooling
- Provide sufficient heating capacity to temper incoming outdoor air, with necessary ductwork, rooftop curb modifications, and new control wiring
- Deliver system testing, balancing, and commissioning for the Council Chambers in Flin Flon, Manitoba
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)