Skip to content
Raise Lens
TENDERgovernmentworks

Climate Resilience in the Water Sector of Kosovo: Seed Investment: Installation of a PV System at a Water Utility 2026 Tender

Fund

In context

This is a contract notice published by a government body covering construction and works. Bids are invited through an open procedure. Delivery covers Kosovo and the European Union (Europe). It is classified under Renewable Energy, Energy Efficiency and Climate Adaptation and 1 other against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures the design, supply, installation, testing, and commissioning of a grid-connected photovoltaic system at a water utility's main pumping station in Kosovo, on a turnkey basis. Bidders should be solar PV system integrators with experience in utility-scale renewable energy installations and grid-connection expertise.

Summary by Raise Lens from the official notice · 10 Oct 2026Accurate?

Unlock the funder, link and full detail

Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.

About this tender

Design, supply, installation, testing, commissioning, and handover of a grid-connected photovoltaic (PV) system on a turnkey basis at the Main Pumping Station of RWC Hidrodrini in Peja, Kosovo. The scope includes all works and services, technical requirements, performance criteria, and obligations as defined in the Technical Specifications of the Tender Documents. Execution period: 23 November 2026 to 15 April 2027. Contract may be extended.

CPV codes