Cogeneration plant construction work – turnkey contract for high-efficiency cogeneration implementation
Original: Cogeneration plant construction work – Încheiere contract la cheie pentru „Implementarea unor capacitati de cogenerare de înaltă eficiență, utilizand motoarele termice, în CTE Progresu”
Electrocentrale Bucuresti S.A.
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Romania
- Contract
- Works · Utility
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a utility covering construction and works. Delivery covers Romania and the European Union (Europe). It is classified under Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This is a turnkey contract for design, construction, and commissioning of a high-efficiency cogeneration plant using thermal engines at Electrocentrale Bucuresti's CTE Progresu facility. Bidders must be experienced EPC contractors capable of delivering complex thermal-power infrastructure with 32 months of design-build execution and 24–36 months of warranty.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Design and execution of cogeneration plant construction work for the implementation of high-efficiency cogeneration capacity using thermal engines at CTE Progresu. Scope includes project design, construction execution, testing, equipment supply, installation, commissioning, trial operation, acceptance testing, and training. Total contract duration is 68 months, with 32 months for design and execution (not later than 31.12.2030). Warranty period is 24 months after commissioning approval for equipment and technological installations, and 36 months for construction and related installations from the date of work completion. Design and execution phases include: 3 months for technical documentation for construction authorization (DTAC, DTAD); Technical Execution Project delivered in stages within 6 months maximum; 26 months for work execution and commissioning. Project implementation deadline is 31.12.2030.
Key requirements
- Design and execution of high-efficiency cogeneration plant using thermal engines
- Technical documentation (DTAC/DTAD) within 3 months; Execution Design within 6 months; 26 months construction and commissioning
- Supply, installation, testing, commissioning, trial operation, and acceptance testing; 24-month warranty for equipment/installations, 36-month for civil works
- Project completion deadline: 31 December 2030; total contract duration 68 months including 32-month design-build phase
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)