This tender closed on 20 August 2026. The deadline passed 98 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Construction and operation of heavy electric vehicle charging park – D1 motorway rest stop Osek nad Bečvou
Original: Construction work – Vybudování a provoz dobíjecího parku pro těžká elektrická vozidla - odpočívka D1 Osek nad Bečvou vlevo - Opakované řízení
- Value
- Not stated · check listing
- Closes
- 20 Aug 2026Closing date passed
- Where
- Czech Republic
- Contract
- Mixed · Government
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Bids are invited through a restricted procedure. Delivery covers Czechia and the European Union (Europe). It is classified under Electric Mobility against the sustainability taxonomy rather than matched on keywords.
Summary
Concession to design, build, and operate a heavy-duty electric vehicle charging park at a D1 motorway rest stop in Czech Republic, complying with EU alternative-fuel infrastructure regulations. Bidders must be capable of project management, civil works, electrical installation, and long-term operations of EV charging infrastructure.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
The Directorate of Roads and Motorways seeks a concessionaire to design, construct, and operate a charging park for heavy electric vehicles at the Osek rest area (km 289.3 left) on the D1 motorway in the Czech Republic. The scope includes: preparation of project documentation; complete engineering activities to obtain construction permits and placement of charging stations; obtaining final approval (kolaudační rozhodnutí); full construction and installation of charging stations meeting AFIR Regulation (EU) 2023/1804 minimum requirements; capacity expansion by 31 December 2030 to meet AFIR standards for heavy vehicles (>3.5 tonnes); operation of the charging park for the contractual period; and decommissioning or sale of infrastructure to the contracting authority upon termination.
Key requirements
- Design and obtain permits for heavy-duty EV charging infrastructure at motorway rest stop
- Construct and install charging stations meeting EU AFIR Regulation 2023/1804 minimum standards by specified deadline
- Expand charging capacity by 31 December 2030 to meet AFIR Article 4(1)(c) requirements
- Operate charging park for concession duration under contract terms
- Decommission or sell charging infrastructure to contracting authority upon contract termination
Relevant sectors
How this compares
About this sector
About this sector
Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)