This tender has closed.
You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.
Construction of 436.17 kW photovoltaic farm with infrastructure for wastewater treatment plant 2026 Tender
••••• organisation
This tender procures construction and installation of a 436.17 kW solar photovoltaic farm with accompanying infrastructure for a wastewater treatment plant in Mikołów, Poland. Bidders should have experience in solar PV system design, civil works, electrical integration, and grid-connection coordination.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
Construction of a 436.17 kW photovoltaic farm with accompanying infrastructure for the wastewater treatment plant "Centrum" in Mikołów, Poland. The project includes construction and installation work based on project documentation, cable routing to a transformer station across investor-owned plots, connection of the newly built photovoltaic farm to a new electrical panel on the treatment plant premises, coordination with TAURON Polska Energia S.A. for grid connection, required testing and commissioning, preparation of handover documentation, post-completion inventory, and system startup. …
Relevant sectors
The direct link to bid is a Pro feature.