Construction of children's rheumatic disease care centre in Sopot
Original: Construction work for buildings relating to health – zaprojektowanie i wykonanie robót budowlanych w ramach inwestycji pn. „Budowa Centrum kompleksowej opieki nad dziećmi z chorobami reumatycznymi przy Pomorskim Centrum Reumatologicznym im. dr Jadwigi Titz-Kosko w Sopocie Sp. z o.o.” wraz z rozbiórką istniejącego obiektu oraz uzyskaniem pozwolenia na użytkowanie zlokalizowanej w Sopocie przy ul. 23 Marca 93
Pomorskie Centrum Reumatologiczne im Jadwigi Titz- kosko Sp. z o.o. w Sopocie
- Value
- Not stated · check listing
- Closes
- 7 Dec 2026
- Where
- Poland
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 30 Nov. This page is open to everyone now.
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Poland (Europe). It is classified under Heating and Cooling, Water and Sustainable Buildings and 1 other against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures design and construction works for a children's rheumatology care centre in Sopot, including demolition of an existing building, parking, and a permit for use. It suits established construction contractors with healthcare building experience rather than sustainability specialists.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Pomorskie Centrum Reumatologiczne (Pomeranian Rheumatology Centre) in Sopot is procuring a design-and-build contract for a new comprehensive care centre for children with rheumatic diseases, at ul. 23 Marca 93 in Sopot. The works include demolishing the existing paediatric rheumatology and rehabilitation building at the Geriatric Care Centre site, together with site elements, and then designing and constructing the new facility. The contractor must prepare the multi-disciplinary technical and execution design, workshop drawings and other required studies, and obtain all permits, decisions and approvals, including a final building-use permit. The scope is split into stages. Stage I covers the new children's care centre with its technical infrastructure. Stage II covers a 30-space ground-level car park with parking systems and technical infrastructure, an underground rainwater retention tank, an oxygen tank station and a canopy with an oxygen decompression room, each with its own building-use permit. Stage III, a fit-out of the second floor of the centre, is subject to an option right. The contract also covers site development and greenery, access roads, external installations and utility connections, a drilling platform for a chalk well (studnia kredowa) across stages I and II, and three years of warranty-period servicing, inspections and maintenance of all systems, installations and equipment, plus landscape maintenance. The contractor must also provide author's supervision (nadzor autorski) by its designers during construction under the Polish Construction Law. The buyer does not require a Faraday cage in the MRI room. The page gives no overall contract duration, though the stages and warranty period imply a multi-year programme.
Lots
- Lot I: Stage I: Children's comprehensive care centre
Demolition of the existing paediatric rheumatology and rehabilitation building, design of the multi-disciplinary technical and execution documentation, construction works including water/sewer, heating, electrical (switchboards, emergency and evacuation lighting) and fire alarm (SSP) installations for the second-floor target fit-out, and obtaining the final building-use permit, together with the associated technical infrastructure.
- Lot II: Stage II: Car park and supporting infrastructure
Design and construction of a 30-space ground-level car park with parking systems and technical infrastructure, an underground rainwater retention tank, an oxygen tank station and a canopy with oxygen decompression room, and obtaining the final building-use permit.
- Lot III: Stage III: Second-floor fit-out (option)
Design, building permit, construction works and final building-use permit for the fit-out of the second floor of the children's care centre. This stage is subject to the contracting authority's option right.
Key requirements
- Multidisciplinary design and construction of the care centre in two stages
- Demolition of the existing building and site clearance
- Obtain final building permit (pozwolenie na użytkowanie) for the facilities
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)