This tender has closed. The deadline passed 36 days ago.
You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.
Construction project for a new bridge over a river tributary in a Spanish municipality, managed by a river basin authority 2026 Tender
••••• organisation
In context
This is a contract notice published by a government body covering construction and works. Bids are invited through an open procedure. Delivery covers Spain (Europe). It is classified under Water and Climate Adaptation against the sustainability taxonomy rather than matched on keywords.
Construction of a new bridge over a tributary in Spain, managed by a Spanish river basin authority. Bidders should be civil engineering and construction firms experienced in hydraulic infrastructure and river-crossing projects.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
Construction project for a new passage/bridge over an affluent of the Barbantiño river in the municipality of Vilamarín, Ourense, Spain. The work is classified as engineering and construction work (CPV 45220000). Project reference: PDM MIÑO-SIL ES010_3_CHCH0XCET29WP2537. This is a public works contract managed by the Confederación Hidrográfica del Miño-Sil (Miño-Sil River Basin Authority) under the Ministry for Ecological Transition and Demographic Challenge.
CPV codes
Relevant sectors
The direct link to bid is a Pro feature.