Skip to content
Raise Lens
Tender · TED (EU)

Construction of S19 expressway section near Łosice, Poland (realisation section 1)

Original: Construction, foundation and surface works for highways, roads – Projekt i budowa drogi ekspresowej S19 odcinek granica woj. podlaskiego – Łosice – granica woj. lubelskiego, odc. realizacyjny nr 1 granica woj. podlaskiego - węzeł Łosice (bez węzła)

Generalna Dyrekcja Dróg Krajowych i Autostrad

Value
PLN 84.6M
Closes
8 Dec 2026
 
Where
Poland
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 39 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 30 Oct 202639 days to prepare
Found today · 26 Nov 202612 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Poland (Europe). It is classified under Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures design and construction of a dual-carriageway S19 expressway section with interchange, bridges, and drainage in Poland's Mazovia region. It suits large road-construction contractors with major infrastructure track record, not sustainability startups.

Summary by Raise Lens from the official notice · 21 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The contracting authority, the General Directorate for National Roads and Motorways (GDDKiA), is procuring design and construction of the S19 expressway on the section from the Podlaskie Voivodeship border through Łosice to the Lublin Voivodeship border. This is realisation section no. 1, running from the Podlaskie border to the Łosice junction (excluding the junction itself). The works lie in Mazovian Voivodeship, in Łosice County, within the gminas of Sarnaki, Platerów and Łosice. The scope covers all design work and construction works needed to build and operate the expressway, including obtaining the required permits. Main elements include a dual-carriageway S-class road from km 0+000 to km 17+263; a road junction; service areas (MOP); reconstruction of roads affected by conflicts with the expressway; construction and reconstruction of non-expressway roads, including access roads to adjacent land; engineering structures across the expressway and across crossing roads and railway lines; ground strengthening for foundations and high embankments, with surface slope protection; technical equipment such as drainage, a technological lane, emergency bays, fencing and networks; traffic management and road safety equipment and signage; environmental protection measures including noise barriers, wildlife crossings and ecoducts with guide fencing, and landscape planting; and relocation of conflicting above- and below-ground utility infrastructure. The authority requires that the contractor personally perform the key tasks: the main carriageway pavement, including production and laying, and the remaining pavement layers above the natural ground or embankment, excluding supply of materials and services. For these key tasks, the contractor may not rely on the capacities of other entities under art. 118(1) of the Polish Public Procurement Law. The estimated contract value is stated as above EUR 20,000,000. The page does not give the expected duration.

Bidder eligibility

Bidders must meet the standard conditions for participation under Polish public procurement law (Pzp). For the key tasks (main carriageway pavement production and laying, and upper pavement layers above natural or embankment ground, excluding supplies and services), the bidder must perform the work itself and may not invoke subcontractor or third-party resources under art. 118(1) Pzp to demonstrate compliance with the conditions for those tasks. Specific technical, financial and experience thresholds are not stated on this page and would be in the full tender documentation.

Key requirements

  • Design and build of dual-carriageway S19 expressway, km 0+000 to 17+263
  • Includes interchange, service areas, bridges, road realignments, and drainage
  • Environmental mitigation (noise barriers, wildlife crossings) is incidental to road construction

CPV codes

Relevant sectors

How this compares

About this sector

Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published30 Oct 2026
Closes8 Dec 2026, 00:00 UTC
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryPoland
RegionEurope
Budget rangePLN 84.6M
Last verified21 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)