Construction project management services – Stadtwerke Essen AG: EU-wide tender Lot 5
Original: Construction project management services – Stadtwerke Essen AG: EU-weites Vergabeverfahren "Projektsteuerung" (Los 5)
Stadtwerke Essen AG
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Germany
- Contract
- Services · Utility
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a utility covering services. Bids are invited through a restricted procedure. Delivery covers Germany and the European Union (Europe). It is classified under Sustainable Buildings, Heating and Cooling and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Procurement of project management and steering services for a low-temperature district heating network implementation by Stadtwerke Essen AG. Bidders must be experienced in complex energy infrastructure project governance, phasing, and multi-lot coordination.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Stadtwerke Essen AG is procuring project management services (Los 5 / Lot 5) for the implementation of a low-temperature heat network. The tender comprises five lots total: Lot 1 (network concept and heat network optimization), Lot 2 (technical due diligence and existing network analysis), Lot 3 (energy center planning including all heat generators and associated technical systems), Lot 4 (heat network planning for distribution to buildings and connection to energy center), and Lot 5 (project management/Projektsteuerung). This notice concerns exclusively Lot 5 project management services. The project management contract provides for optional phased commissioning. Lots 1, 2, and 5 are published simultaneously in the EU procurement notice; Lots 3 and 4 are published on a staggered basis. The scope references detailed performance specifications, cross-lot project descriptions, and the project management contract.
Bidder eligibility
Bidders may submit offers in either Lot 5 alone or in one or more of Lots 1-4, but NOT simultaneously in Lot 5 and any of Lots 1-4 (lot limitation). Offers violating this lot limitation restriction will be excluded from the procedure. Standard EU public procurement eligibility applies.
Lots
- Lot 5: Projektsteuerung (Project Management)
Project management services for the low-temperature heat network implementation, including phased optional commissioning as specified in the project management contract.
Key requirements
- Project steering and management for low-temperature district heating network implementation
- Coordination across five work packages (network concept, due diligence, energy centre design, network planning, project control)
- Phased optional contracting structure with staged engagement
- Exclusivity constraint: cannot bid simultaneously on Lots 1–4 and Lot 5
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)