Construction work – 9843 Design and Build Capacity Enhancement Works at Connolly Station
Iarnród Eireann-Irish Rail
- Value
- Not stated · check listing
- Closes
- 26 Nov 2026
- Where
- Ireland
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Ireland (Europe). It is classified under Water, Heating and Cooling and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures a design-and-build contractor to develop the reference design to Approved for Construction, then build, test and commission capacity enhancement works at Connolly Station in Dublin, including a new Preston Street entrance, lifts, escalators and heritage refurbishment. It suits an experienced major civil and rail-infrastructure contractor able to work in a live operational railway, rather than an early-stage sustainability firm.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Iarnród Éireann (Irish Rail) is procuring an experienced Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station, Dublin. The scope includes a new entrance from Preston Street, a passenger concourse within the historic Victorian undercroft, new lifts, escalators and staircases giving improved access to Platforms 5, 6 and 7, additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations, and the installation or modification of station and railway systems. The Contractor must review and develop the reference design through detailed design to Approved for Construction status, then construct, test and commission the works, and provide complete as-built and handover information. The appointed Contractor will also act as Project Supervisor for the Construction Stage. Work will take place in a constrained, live operational railway environment, requiring management of passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The anticipated form of contract is the NEC4 Engineering and Construction Contract, Option C (target contract with activity schedule). This notice is a reissue of an earlier competition published in May 2025 (procedure identifier e342e2b9-7827-4a53-81b6-5178881e0fa0; eTenders reference 5643930), which was discontinued without award. Contract duration and contract value are not stated on the page.
Key requirements
- Design and build contractor to develop reference design through detailed design to Approved for Construction
- Construct, test and commission works within a live operational railway, managing passenger circulation and safety
- Act as Project Supervisor for the Construction Stage; NEC4 Engineering and Construction Contract Option C target cost with activity schedule
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)