Construction work – Electrical infrastructure development for a Polish transportation-hub investment, including high-voltage substations (110 kV/15 kV), power generation facilities, and transmission lines connecting to the national grid Tender
••••• organisation
Construction of electrical infrastructure for a Polish transportation hub, including 110 kV/15 kV substations, power generation facilities, and transmission lines connecting to the national grid. Bidders must have substantial experience in high-voltage electrical infrastructure design, construction, and SCADA systems integration.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
Construction of power supply infrastructure for Port Polska investment, including: RPZ buildings (110 kV/15 kV), GPO-C station building (110 kV/15 kV), generator unit station buildings, and 110 kV cable lines connecting Port Polska investment with the national power grid. The contract is divided into 7 Tasks (all under a single agreement): Task 1 - construction works and design for connection to PGE 110/110 kV station with 110 kV lines on east and south sides of airport; Task 2 - construction works and design for RPZ-1 distribution point station with SCADA system; Task 3 - construction works a …
CPV codes
Relevant sectors
The direct link to bid is a Pro feature.