Construction work for bridges – Building team renovation Potters and Rabat bridges
Original: Construction work for bridges – Bouwteam renovatie Potters- en Rabatbrug
Gemeente Gouda
- Value
- Not stated · check listing
- Closes
- 18 Dec 2026
- Where
- Netherlands
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 25 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Netherlands (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Gouda municipality is procuring a contractor for a design-build team phase and then the realisation of renovating the two movable Potters and Rabat bridges, replacing mechanical and electrical systems, steel bridge leaves and structural substructure. Suited to experienced civil and steel bridge contractors able to meet a fixed budget and integrate with the city's COB traffic system; the work is conventional infrastructure renewal rather than climate-focused.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Municipality of Gouda (Gemeente Gouda) intends to contract a contractor for the design-team (bouwteam) phase and, under the terms of a Bouwteam agreement, the subsequent realisation of the renovation of the Potters- en Rabatbrug. Both bridges are movable bridges dating from around 1957. Inspections show that the mechanical and electrical installations have reached the end of their technical service life, and the steel bridge leaves also need replacement. The scope includes designing and building new steel bridge leaves, replacing the mechanical installation and the E/IA (electrical, control and instrumentation) installation, structural reinforcement of the substructure, repair of civil and building structures, and connection to the COB (the Dutch central bridge control system). The contractor will participate in the bouwteam phase and is the intended executor of the realisation phase. A target budget (taakstellend budget) applies to the assignment. The objective is to keep both bridges safe, reliable and future-proof for at least 30 years and to connect them to the COB. The page does not state the contract duration or the timing of the realisation phase.
Bidder eligibility
Not stated on the page. The notice refers to a Selectieleidraad (selection guide), which presumably contains the bidder requirements, but its content is not included in the provided text.
How bids are scored
Not stated on the page. The notice refers to the Selectieleidraad, which is not reproduced here.
Key requirements
- Participate in building team phase under Bouwteamovereenkomst with target budget
- Design and deliver new steel bridge leaves, mechanical and E/IA installations, and substructure reinforcement
- Maintain both bridges safely for at least 30 years and connect them to the COB system
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)