Skip to content
Raise Lens
TENDERutilityworks

Construction work for electricity power lines – Framework agreement for modernization of electricity distribution infrastructure in a Romanian county over 36 months Tender

••••• organisation

In context

This is a contract notice published by a utility covering construction and works. Bids are invited through a framework agreement. Delivery covers Romania (Europe). It is classified under Grid Modernization and Energy Efficiency against the sustainability taxonomy rather than matched on keywords.

Summary

Framework agreement for design and execution of electricity distribution network modernization in Olt County, Romania over 36 months. Bidders must be engineering and construction firms capable of delivering electrical infrastructure upgrades and monthly contract awards.

Summary by Raise Lens from the official notice · 15 Sept 2026Accurate?

Unlock the funder, link and full detail

Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.

About this tender

Procurement of design and execution services for modernization of electrical branches through installation of FDCP/BMP equipment in DEO installations within the activity zone of Olt County for a period of 36 months. Subsequent contracts will be awarded monthly or as needed based on investment works implementation in electrical distribution networks. The service scope includes technical design and construction execution as detailed in the Technical Specifications document.