Construction work for kindergarten buildings – Design and build of Zamień Municipal Kindergarten
Original: Construction work for kindergarten buildings – Projekt i budowa Przedszkola Gminnego w Zamieniu wraz z salą Gminnego Ośrodka Kultury oraz infrastrukturą towarzyszącą
Gmina Lesznowola
- Value
- Not stated · check listing
- Closes
- 4 Dec 2026
- Where
- Poland
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Poland (Europe). It is classified under Heating and Cooling against the sustainability taxonomy rather than matched on keywords.
Summary
A Polish municipality (Gmina Lesznowola) is procuring a design-and-build contract for a modular steel municipal kindergarten in Zamień, with a culture-centre hall, utility connections, play area, internal roads and an underground shelter garage. It suits established construction contractors with design-build capacity rather than early-stage sustainability firms.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The procurement covers a design-and-build contract for a municipal kindergarten (Przedszkole Gminne) in Zamień, Gmina Lesznowola. The kindergarten is to be built as a modular steel structure, together with supporting infrastructure: water supply and sewerage connections, electrical and telecommunications connections, a kindergarten playground, a publicly accessible green area, internal access roads, and landscaping. The contractor must also provide complete as-built documentation. Under the 'design and build' (zaprojektuj i buduj) model, the contractor must obtain the building permit and the decision authorising use of the facility. The scope also includes designing an underground garage with a temporary emergency shelter function (Miejsce Doraźnego Schronienia) and obtaining a building permit for that structure. The title also refers to a hall for the Gminny Ośrodek Kultury (Municipal Culture Centre) as part of the project, but the body text does not describe this element. Stated site parameters: development area 12,679 m²; plot area 12,679 m²; built-up area 2,156 m². The detailed scope is set out in the Functional-Utility Programme (Program Funkcjonalno-Użytkowy) and the Specification of Essential Terms of the Contract (SWZ). Contract duration is not stated in the notice text.
Key requirements
- Design-and-build delivery of modular steel kindergarten building per Functional-Utility Programme
- Connections for water, sewage, electrical and telecom infrastructure, plus play area and internal roads
- Obtain building permit and occupancy permit, plus underground shelter garage design and complete as-built documentation
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)