Construction work for waterways – Elbląg river waterway, section P1 to Port point
Original: Construction work for waterways – Tor wodny na rzece Elbląg na odcinku od punktu P1 do punktu Port
Dyrektor Urzędu Morskiego w Gdyni
- Value
- Not stated · check listing
- Closes
- 25 Nov 2026
- Where
- Poland
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Poland and the European Union (Europe). It is classified under Water, Climate Adaptation and Waste Reduction and 1 other against the sustainability taxonomy rather than matched on keywords.
Summary
Polish maritime office tender for hydrotechnical construction of a navigable waterway on the Elbląg river, including channel lining, dredging and navigational marking for a future fairway and turning basin. Suited to experienced hydraulic and marine civil contractors rather than early-stage sustainability firms.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The procurement covers construction works for hydrotechnical infrastructure: a waterway on the Elbląg river between points P1 and Port. The scope includes building the fairway channel, its lining (obudowa toru), dredging works (prace czerpalne), and navigational marking for the future fairway and turning basin (obrotnica). The technical scope is set out in the technical documentation listed in the notice, which includes: the construction design (site development plan, architectural-construction design for the river and turning basin, technical design, and technical specifications for execution and acceptance of works); geological-engineering documentation; a ferromagnetic survey report; a navigational analysis with a navigation marking design; and a water-law operating document (operat wodnoprawny). The notice also lists the required decisions and permits, including an environmental conditions decision (WOOŚ.420.18.2025.AZ.17), a site location decision, a permit for artificial islands and structures in Polish maritime areas, a voivodeship heritage conservator permit (ZW-124/176/2025 of 16.04.2026), and a WIN decision (WIN-II.7850.5.1.2026.KKO of 27.02.2026). Works must follow the Scope of Work Description (OPZ, annex 1.1 to the SWZ) and the Regional Environmental Protection Director's decision of 27.03.2026. Contractor obligations and contract conditions are set out in the draft contract (annex 2 to the SWZ). The expected duration is not stated in the extracted text.
Key requirements
- Build navigable waterway with channel lining, dredging and navigational marking per design documentation
- Comply with environmental decision WOOŚ.420.18.2025.AZ.17 and conservator and water-law permits
- Work from the technical design, OPZ and draft contract attached to the SWZ
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)