Skip to content
Raise Lens
Tender · TED (EU)

Construction work – Projekt 907001 – Stamrenovering Baron Rogers Gata

Bostads AB Poseidon

Value
Not stated · check listing
Closes
18 Jan 2027
 
Where
Sweden
Contract
Works · Soe

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 92 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 18 Oct 202692 days to prepare
Found today · 24 Nov 202655 days to prepare

In context

This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Sweden (Europe). It is classified under Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Major renovation of three 1960s residential buildings (199 apartments) including comprehensive energy-system upgrades: electrical rewiring, heating-system replacement, FTX ventilation installation, bathroom and kitchen renovation, and balcony refurbishment. Bidders should be experienced construction firms capable of managing large-scale residential deep-energy retrofits in Sweden.

Summary by Raise Lens from the official notice · 9 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The procurement concerns a construction contract for a full stamrenovering (complete renovation of building systems) of three multi-storey residential buildings in Backa, Gothenburg, on properties designated Backa 78:2, 78:3 and 78:4. The buildings have 7 to 8 floors, 199 apartments in total and 6 commercial premises. Two apartments sit on each floor in each stairwell. The scope covers renovation of all bathrooms together with kitchen works in the apartments. All electrical risers will be replaced in their entirety. Heating risers will be replaced in the common areas and in some parts of the apartments. Balcony fronts will be replaced and the balconies renovated. FTX (mechanical ventilation with heat recovery) will be installed in all building sections. The buildings date from the late 1960s, are part of the Million Programme (Miljonprogrammet), and are not included in a preservation programme. Floor slabs are concrete and the facade consists of seashell-like facade elements. The page does not state the contract duration, phasing, or the expected completion date.

Key requirements

  • Complete electrical system replacement in all three buildings
  • Heating-system retrofit including heat-distribution upgrades in common areas and selected apartments
  • FTX (mechanical ventilation with heat recovery) installation across all building sections
  • Comprehensive bathroom renovation in all 199 apartments
  • Kitchen work and upgrades in apartments
  • Balcony-front replacement and balcony renovation
  • Work on 1960s-era concrete-frame buildings with stone-facade elements

CPV codes

Relevant sectors

Efficiency tendersInfrastructure

How this compares

About this sector

Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published16 Oct 2026
Closes18 Jan 2027
Buyer typeSoe
TypeWorks
DeliveryOn-site
CountrySweden
RegionEurope
CurrencySEK
Last verified9 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)