Skip to content
Raise Lens
Tender · Islamic Dev. Bank

Consultancy Services for the Design Review and supervision of construction and installation of solar PV power generation (100MW) including grid interconnection and evacuation infrastructure (EPC) in Niger State

IsDB-financed project, Nigeria

Value
Not stated · check listing
Closes
3 Dec 2026
 
Where
Nigeria
Contract
Consulting · Multilateral

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 21 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 12 Nov 202621 days to prepare
Found today · 25 Nov 20268 days to prepare

In context

This is a contract notice published by a multilateral institution covering consulting. Delivery covers Nigeria (Africa). It is classified under Renewable Energy, Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Consultancy for design review and construction supervision of a 100MW solar PV plant with grid interconnection and evacuation lines in Niger State, Nigeria, under an IsDB-financed EPC project. Suited to engineering consultancies with utility-scale solar PV, substation and transmission supervision experience; a small firm would likely need to partner or sub-consult.

Summary by Raise Lens from the official notice · 23 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Government of Niger State, through the Federal Government of Nigeria, has applied for Islamic Development Bank (IsDB) financing for the Niger State Solar Energy Development Project (Project No. NGA-1063). Part of the proceeds will fund consulting services. The client is the New Niger Development Project (NNDP), acting through its Project Implementation Unit (PMU) in Minna, Niger State. The assignment is a Request for Expressions of Interest (Reference NSSEDP/CON/QCBS-MC/26/01) for consultancy services covering the detailed design review and construction supervision of a 100 MW solar PV power generation plant, including grid interconnection and evacuation infrastructure, delivered on an EPC basis. This is an expression-of-interest stage. Consultants are asked to show their legal incorporation, professional membership, relevant experience, organisational and managerial structure, and the availability of suitably experienced key personnel. Detailed Terms of Reference are available from the PMU at the address listed in the notice. The selection will follow the International Shortlist procedure under the Quality and Cost Based Selection Method for Member Country (QCBS-MC) in the IsDB Procurement Regulations. Consultants may associate with other firms, either as a joint venture or as a sub-consultant, but must state the form of association clearly. Joint venture partners are jointly and severally liable for the entire contract if selected. The notice does not state the contract duration.

Bidder eligibility

Shortlisting criteria, as stated in the notice: 1. Evidence of legal incorporation and professional membership. 2. Verifiable evidence of general experience in design review and construction supervision of civil works and power generation contracts within the last 10 years. 3. Demonstrated effective organisational/managerial structure and availability of suitably experienced key personnel relevant to the assignment. 4. At least three (3) contracts on design review and construction supervision of a minimum 60 MW solar power generation (EPC) or related assignments, completed within the last seven (7) years under Multilateral Development Bank (MDB) projects. Key experts are not evaluated at the shortlisting stage. Conflict of interest rules apply under paragraphs 1.12.1 and 1.12.2 of the IsDB Guidelines for Procurement of Consultant Services (April 2019 edition, revised February 2023).

How bids are scored

Selection uses the Quality and Cost Based Selection Method for Member Country (QCBS-MC) under the IsDB Procurement Regulations. The notice does not disclose the quality/cost weighting or the detailed scoring rubric. At this expression-of-interest stage, the published shortlisting criteria are the four criteria listed under eligibility. Key experts are assessed only after shortlisting.

Key requirements

  • Design review of 100MW solar PV EPC works and grid interconnection/evacuation infrastructure
  • Supervision of construction and installation on site in Niger State
  • IsDB-financed procurement rules apply; demonstrated utility-scale solar PV and transmission experience expected

Procurement contact

The notice names a procurement contact for clarification questions.

Relevant sectors

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceIslamic Dev. Bank
Closes3 Dec 2026, 12:00 UTC
Buyer typeMultilateral
TypeConsulting
DeliveryOn-site
CountryNigeria
RegionAfrica
SubmissionExpression of Interest, submitted as a well-sealed, bound package in two (2) har
Last verified23 Nov 2026

Documents to prepare

Named in this notice. Check the official notice for the full list.

  • Evidence of legal incorporation
  • Evidence of professional membership
  • Verifiable evidence of general experience in design review and construction supervision of civil works and power…
  • Evidence of effective organisational/managerial structure
  • Evidence of availability of suitably experienced key personnel relevant to the assignment
  • Details of at least three (3) contracts on design review and construction supervision of a minimum 60 MW solar power…