Design and construction of Energy subsystem traction network, line 85 Warsaw-Łódź
Original: Construction work – Opracowanie dokumentacji projektowej i realizacja robót budowlanych w zakresie podsystemu "Energia" - sieć trakcyjna na linii kolejowej nr 85 odc. Warszawa - Łódź
Centralny Port Komunikacyjny sp. z o.o.
- Value
- Not stated · check listing
- Closes
- 27 Nov 2026
- Where
- Poland
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Poland and the European Union (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
A state-owned rail developer (Centralny Port Komunikacyjny) is procuring design and construction of the overhead traction power network (Energy subsystem) for the 350 km/h line 85 between Warsaw and Łódź, including substations, autotransformer cabins, switching control, and EU vehicle-authorisation certification. The contract suits large rail engineering contractors with traction-power track records, not early-stage sustainability firms.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The buyer, Centralny Port Komunikacyjny sp. z o.o., is procuring the design documentation and construction works for the traction power network (overhead contact line) subsystem "Energia" on railway line No. 85, section Warszawa to Łódź. The scope covers the traction network with power supply elements, autotransformer cabins, and control of the KDP network switches, on the section Kotowice to the CPK Rail Hub and Łódź. It also includes connections to the existing or under-construction infrastructure of PKP PLK, including any reconstruction of existing PKP PLK infrastructure at the connection points that is necessary to complete the works. The contractor must obtain the EC verification certificate for the Energia subsystem, issue the required verification declarations, and prepare all documentation needed to obtain authorisation to place the Energia subsystem into service for an indefinite period. The design and operating speed of the line is 350 km/h. The detailed subject matter is set out in the Needs and Requirements Description (Opis Potrzeb i Wymagań, OPW), which is referenced but not reproduced on the page. The contract duration is not stated on the page.
Key requirements
- Prepare full design documentation and carry out construction works for the traction power subsystem on the Kotowice to Łódź section
- Obtain EU verification certificate for the Energy subsystem and prepare documentation for permanent operating authorisation
- Build traction substations, autotransformer cabins and KDP switch control, with adaptations to existing PKP PLK infrastructure
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)