Design and cost documentation for water-damming structures, Łupawa Forest District 2026 Tender
Original: Engineering design services – Wykonanie dokumentacji projektowo – kosztorysowej dla obiektów urządzeń piętrzących w ramach projektu „Lasy dla mokradeł” wraz z pełnieniem nadzoru autorskiego na terenie Nadleśnictwa Łupawa – I postępowanie
Skarb Państwa PGL LP Nadleśnictwo Łupawa
In context
This is a contract notice published by a government body covering services. Bids are invited through an open procedure. Delivery covers Poland (Europe). It is classified under Water, Biodiversity and Nature and Climate Adaptation and 1 other against the sustainability taxonomy rather than matched on keywords.
Engineering design and supervision services for a wooden weir structure to raise groundwater levels in a wetland restoration project on state forest land in Poland. Bidders must have expertise in hydrological engineering, water retention design, environmental impact assessment, and construction supervision in protected natural areas.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contracting authority, Nadleśnictwo Łupawa (State Forests), is procuring engineering design services under the "Lasy dla mokradeł" (Forests for Wetlands) project, first procedure ("I postępowanie"). The scope is to prepare design and cost estimate documentation (dokumentacja projektowo-kosztorysowa) for a water-damming structure: a wooden oak weir (drewniana zastawka dębowa) with a 1.5 m bottom width and side slopes of about 45 degrees. It will be located in compartment 190f00 in the Flisów forest district, Czarna Dąbrówka commune, Bytów county, Pomeranian Voivodeship, on plot 190/1 in the Mikorowo precinct. The target is to raise the water level by about 30 cm above the terrain elevation of 102.0 m a.s.l., over a sub-area of 0.93 ha. The current water level is 20 cm. Design work is limited to what is necessary for the water structure, including any erosion protection and maintenance of the adjacent ditch. The design must calculate the volume of water retained and the total impact area. This covers surface inundation and groundwater impact, broken down by Natura 2000 areas, habitats within Natura 2000 areas, areas outside Natura 2000, and nature reserves. The buyer states that the aim is groundwater retention rather than creating an open-water reservoir. Deliverables and duration: the design documentation is due within 16 months of contract signature. Author supervision (nadzór autorski) runs from the launch of the subsequent public works tender until the works are properly completed, and no longer than 36 months from award of this contract.
Key requirements
- ✓Design wooden oak weir (1.5 m base width, ~30 cm height) with hydrological calculations for groundwater retention
- ✓Calculate retained water volume, surface area of impact on groundwater and surface water, with breakdown by Natura 2000 areas, habitats, and protected reserves
- ✓Prepare full design and cost documentation within 16 months; provide construction supervision for up to 36 months
- ✓Environmental compliance: erosion protection design, habitat impact assessment, coordination with forest management (Nadleśnictwo Łupawa)
Relevant sectors
How this compares
- Compared with 255 similar tenders (water in Poland) listed in the last 12 months.
- Similar tenders that state a value range from $14k to $7.7m, with a median of $350k (6 tenders).
- It allows 35 days to respond, longer than the typical 30 days across 136 similar tenders.
- The same organisation listed 1 other similar tender here in the last 12 months.
Closest open tenders
- Design documentation for modernising 22 pressure-reducing stations on Warsaw water network
- Reconstruction of DN150 water pipeline on Śląska Street with pavement renovation
- Servers – software and hardware delivery for cyber-secure water supply, Rymanów
- Environmental consultancy: weirs' impact on biological continuity and water body goals
- Two new dual-function sewer-cleaning special vehicles supply
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →