Design services for Brno rail hub Heršpice and passenger station
Original: Engineering design services for the construction of civil engineering works – Železniční uzel Brno, etapa Heršpice a Osobní nádraží
- Value
- Not stated · check listing
- Closes
- 4 Jan 2027
- Where
- Czech Republic
- Contract
- Services · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering services. Delivery covers Czechia (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Czech state rail manager Správa železnic seeks a design firm to deliver EIA cooperation, building permit documentation in BIM, permit applications and project updates for the Brno rail hub Heršpice and Osobní nádraží stage. Suited to large engineering design firms with rail and BIM track records, as the scope is extensive and coordinated with other Brno rail contracts.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contract covers engineering design services for civil engineering works on the Brno railway junction, stage Heršpice and Osobní nádraží, commissioned by Správa železnic, státní organizace. The scope has eight parts. (a) The contractor cooperates on the EIA documentation by preparing inputs for the EIA preparer, coordinating the technical design with the EIA outputs and recommendations, and incorporating EIA conclusions into the project documentation for the building permit. (b) The contractor prepares the project documentation for the building permit (DPS) for transport infrastructure in BIM mode, in sufficient detail to be approved in the permit-of-intent proceedings under Act No. 283/2021 (the Building Act). This includes the notified body's opinion at the permit stage and BOZP (occupational safety) coordinator activities in the preparation phase, including a construction site safety plan and a maintenance manual. (c) The contractor prepares and files the application for the permit of intent with all required documents, and cooperates until the related decisions become final. (d) The contractor develops the works in BIM mode and produces the Information Model under Annex 11 (BIM Protocol) of the contract, delivered progressively according to the schedule in Annex 5. (e) The contractor coordinates this contract with the 'Železniční uzel Brno, etapa Černovice' and 'Železniční uzel Brno, etapa Židenice' contracts to keep a unified technical concept. Additional items include (f) an optional update of the Project Intention (AZP) under the Ministry of Transport rules, reserved by the buyer as a contract change under §100(1) of the Public Procurement Act, triggered by a 10% rise in estimated investment costs or major design changes; (g) creation and maintenance of data for a public GIS portal; and (h) design supervision during the execution design (DPS/PDPS) phase. The expected duration is not stated in the provided text.
Key requirements
- Prepare permit-stage design documentation in BIM for rail infrastructure
- Cooperate on EIA documentation and integrate its conclusions into the design
- Prepare and file the building permit application and support permits to final validity
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)