Design, technical assistance and works for University Tower energy rehabilitation
Original: Building alteration work – Proiectare, asistență tehnică și execuție lucrări aferente obiectivului de investiții: MODERNIZARE, REABILITARE ENERGETICĂ CENTRUL DE ÎNVĂȚĂMÂNT, CERCETARE ȘI SERVICII MEDICO-FARMACEUTICE ”UNIVERSITY TOWER”
Universitatea de Medicina, Farmacie, Stiinte si Tehnologie " George Emil Palade" din Targu Mures
- Value
- Not stated · check listing
- Closes
- 27 Nov 2026
- Where
- Romania
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Romania (Europe). It is classified under Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
A Romanian public university is procuring design, technical assistance and construction works to modernise and energy-retrofit its "University Tower" teaching, research and medical-pharmaceutical services centre, including design verification and as-built documentation. Suited to established Romanian construction contractors and design firms able to deliver building retrofit works, with SMEs more likely to win as subcontractors.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The buyer, Universitatea de Medicina, Farmacie, Stiinte si Tehnologie "George Emil Palade" din Targu Mures, is procuring a combined design, technical assistance and works contract for the modernisation and energy rehabilitation of the "University Tower" teaching, research and medico-pharmaceutical services centre. The design component covers a physical security risk analysis and intruder alarm system design (for the IPJ opinion), the technical execution project, execution details, specifications, value estimates, bills of quantities (including site organisation), the general works schedule, the as-built project, the final fire safety scenario (for the fire safety authorisation), an updated general estimate at completion, and operation, maintenance and end-of-life documentation. It also includes independent technical quality verification of the technical project and execution details against the fundamental requirements of Law 169/2026 on the Code of spatial planning, urbanism and construction. The execution component covers the works themselves, to be carried out in line with the approved technical project, using only agrément-certified materials compliant with HG 766/1997, HG 668/2017 and Law 169/2026. The contractor must also provide project management for the investment, with a named contract/project manager who communicates directly with the contracting authority. The designer must provide technical assistance throughout execution and, if needed, during the warranty period at no extra cost. The contractor must also deliver an energy performance certificate on completion. The contract runs for 15 months from the administrative order to start design: about 3 months for design, verification and any revisions, followed by 12 months for execution from a separate start-of-works order. The buyer issues separate start orders for design and for execution.
Bidder eligibility
Design verification must be performed by specialists independent of the designers who prepared the project, accredited by the Ministry of Regional Development and Public Administration (MDRAP) as project verifiers for the relevant construction domains/subdomains and installation specialties. Materials must be agrément-certified under national regulations. No other registrations, classifications, prior-experience references or financial thresholds are stated in the provided text.
Key requirements
- Design, technical verification and execution of energy rehabilitation works on the University Tower building
- Fire safety, security alarm and as-built documentation deliverables required under Romanian construction law
- Works contract for a public university under Romanian public procurement rules
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)