TENDERmultilateralconsulting
Detailed technical and environmental-social studies for Lueta hydroelectric plant, Phase 1 Tender
••••• Bank
Summary
Procurement of detailed technical and environmental-social studies for a hydroelectric power plant on the Lueta River in Democratic Republic of Congo, Phase 1. Bidders should be engineering consultancies with expertise in hydropower feasibility, environmental impact assessment, and social safeguards in sub-Saharan Africa.
Summary by Raise Lens from the official notice · 10 Sept 2026Accurate?
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
Closing date not stated · check listing
The direct link to bid is a Pro feature.
Quick facts
Published20 Jul 2026
Buyer typemultilateral
Typeconsulting
DeliveryOn-site, Hybrid
CountryCD
Last verified10 Sep 2026
Related tenders
Executive Council - Request for Proposal - REQUEST FOR PROPOSALS
••••• Council
Tarjouspyyntö, Rakennetun ympäristön puiden hoidon puitejärjestely 2026-2030
••••• organisation
Opportunity Nr 4
••••• organisation
UT2 Trabajos de asfaltado con mezclas bituminosas en caliente y dobles tratamientos asfalticos, para el proyecto de actuaciones de mejora de accesibilidad para la gestion y conservacion de hábitat en las Sierras del Gavilan, Los Alamos y Salinas TT.MM. de Caravaca de la Cruz, Moratalla y Yecla (Murcia)
••••• organisation
Obra de adecuación de los equipos de medida de la instalación fotovoltaica de Alojera (La Gomera) para su adaptación a la configuración tipo 2, en el marco del encargo La Gomera 100% Sostenible, consistente en el apoyo técnico al Cabildo de la Gomera para el seguimiento y operación sostenible de los proyectos ejecutados por el ITC.
••••• Institute
Geophysical Survey of Wind Farm Search Area 6/7
••••• Ministry