Skip to content
Raise Lens
Tender · UNGMClosed

Development of Conceptual Design and Cost Estimation for Decentralized Sanitation and Wastewater Treatment Solutions & Management plan in Korail Settlement, Dhaka

Value
Not stated · check listing
Closes
21 Sep 2026Closing date passed
Where
Bangladesh
Contract
Consulting · Un agency

In context

This is a contract notice published by a UN agency covering consulting. Delivery covers Bangladesh and South-Asia (Asia). It is classified under Water, Climate Adaptation and Environmental Justice against the sustainability taxonomy rather than matched on keywords.

Summary

UNICEF seeks conceptual design and cost estimation for decentralized sanitation and wastewater treatment infrastructure in Korail Settlement, Dhaka, targeting water access and environmental health. Bidders should have expertise in wastewater treatment engineering, decentralized systems design, and cost estimation in low-income urban contexts.

Summary by Raise Lens from the official notice · 22 Sept 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

Development of a comprehensive conceptual design and cost estimation for decentralized sanitation and wastewater treatment solutions in Korail Settlement, Dhaka, Bangladesh. The assignment involves assessing existing sanitation, wastewater, and fecal sludge management contexts; developing technically feasible, climate-resilient decentralized and hybrid wastewater management scenarios; preparing conceptual engineering designs and service-zone maps; and estimating indicative CAPEX, OPEX, and lifecycle costs. Deliverables include a baseline assessment with service-zone mapping, decentralized/hybrid sanitation options with concept designs, and a comprehensive sanitation and wastewater management plan with investment framework. The project duration is 3 months and is located in Karail Slum, Dhaka, with reporting to the WASH Specialist at UNICEF Bangladesh.

Bidder eligibility

Consulting firms/institutions must have: at least 10 years of demonstrated experience in urban sanitation, wastewater management, environmental engineering, or related infrastructure planning; completion of at least 5 assignments in decentralized wastewater treatment systems (DEWATS/DWTS), fecal sludge management (FSM), or citywide inclusive sanitation (CWIS) planning during the last 10 years; at least 5 years of experience working in high-density urban settlements, informal settlements, slums, or low-income communities in Bangladesh or abroad; proven experience in preparing sanitation master plans, feasibility studies, conceptual engineering designs, or investment plans; experience in Bangladesh or comparable South Asian contexts; multidisciplinary capacity covering engineering, planning, environmental management, social inclusion, and financial analysis. Required team composition includes Team Leader/Senior Sanitation Engineer, Wastewater Treatment Specialist, Urban Planner/GIS Specialist, Environmental Engineer, Economist/Financial Analyst, and Social Development & Community Engagement Specialist.

How bids are scored

Technical Proposal (70 points, minimum 49 points required for compliance): Technical Approach and Methodology (35 points); Technical Soundness of Proposed Solutions (15 points); Relevant Institutional Experience (10 points); Qualifications and Experience of Key Experts (10 points) including Team Leader (3.0), Wastewater Treatment Specialist (1.5), Urban Planner/GIS Specialist (1.0), Environmental Engineer (1.0), Economist/Financial Analyst (1.5), Social Development Specialist (1.0), and Team Complementarity (1.0). Financial Proposal (30 points). Final selection based on quality and cost basis.

Key requirements

  • Conceptual design for decentralized sanitation and wastewater treatment systems
  • Cost estimation and financial analysis for proposed solutions
  • Management plan development for long-term operation and maintenance
  • Site-specific assessment and community engagement in Korail Settlement

Procurement contact

The notice names a procurement contact for clarification questions.

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceUNGM
Published26 Aug 2026
Closes21 Sep 2026
Buyer typeUn agency
TypeConsulting
DeliveryOn-site, Hybrid
Site visitRequired
CountryBangladesh
RegionAsia
SubmissionTechnical proposal and financial proposal via UNGM e-tender portal (two-stage ev
Last verified22 Sep 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)

Related tenders

Bangladesh: Social Safeguards Officer, Climate-Resilient Livelihood and Watershed Project
Asian Development Bank
MK/W-06 Rehabilitation of embankment on both banks of the Muhuri River (Length=3975m) including re-excavation/dredging of the river (Length=2200m), bank protection works with toe protection of embankment (Length=300m), and construction of inlets (8 Nos) in adjacent areas from river chainage 12.400 km to 14.600 km=2.200 km in connection with "Rehabilitation of Muhuri-Kahua Flood Control, Drainage and Irrigation Project in Feni District (1st Phase)" under Feni WD Division, BWDB, Feni.
Feni WD Division, BWDB
MK/W-07 Rehabilitation of embankment on both banks of the Muhuri River (Length=3845m) including re-excavation/dredging of the river (Length=2300m), bank protection works with toe protection of embankment (Length=610m), and construction of inlets (5 Nos) in adjacent areas from river chainage 14.600 km to 16.900 km=2.300 km in connection with "Rehabilitation of Muhuri-Kahua Flood Control, Drainage and Irrigation Project in Feni District (1st Phase)" under Feni WD Division, BWDB, Feni.
Feni WD Division, BWDB
Small-scale water resources works for Chandpura subproject, Sadar Barishal
Office of the Executive Engineer, LGED, Barishal
CDRSSWRMP Package CW11-15 small-scale water resources works, Tushkhali Choto Machua
Office of the Executive Engineer, LGED, Pirojpur
CDRSSWRMP/26-27 ADB PRS Package CW13-34 Small Scale Water Resources Works, Nilty-Chirapara
Office of the Executive Engineer, LGED, Pirojpur