Skip to content
Raise Lens
TENDER · TED (EU)utilityworks

District heating boiler Tender

Original: District heating boiler – Nødlastkedel - Energi Ikast Varme A/S

Energi Ikast Varme A/S

In context

This is a contract notice published by a utility covering construction and works. Delivery covers Denmark and the European Union (Europe). It is classified under Heating and Cooling and Energy Efficiency against the sustainability taxonomy rather than matched on keywords.

Summary

Energi Ikast Varme A/S seeks procurement of a 14 MW emergency/backup district heating boiler with associated building construction and installation. Bidders should have expertise in industrial boiler manufacturing, district heating systems, and construction of utility-scale thermal infrastructure.

Summary by Raise Lens from the official notice · 8 Jul 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Energi Ikast Varme A/S is procuring the establishment and installation of a 14 MW emergency/backup load boiler (nødlastkedel) including an associated building. This is a district heating boiler supply and installation contract located in Ikast, Vestjylland, Denmark. The contract covers both the supply of the district heating boiler equipment (CPV 42515000) and the associated district-heating plant construction work (CPV 45251250), making it a combined supplies and works contract. The project duration runs from 23 March 2026 to 8 October 2026. The contract was awarded on 5 May 2026 to Exodraft Energy A/S, a micro/small/medium enterprise based in Vejle, Denmark, for a contract value of DKK 6,843,640.

How bids are scored

Bids are evaluated on four criteria: Price (50%), Technical description (30%), Timeline/Schedule (10%), and Competences (10%).

Key requirements

  • ✓Supply and installation of 14 MW district heating boiler
  • ✓Design and construction of associated boiler house building
  • ✓Emergency/backup thermal capacity for district heating network
  • ✓Full commissioning and integration with existing heating infrastructure

Recent prior contract holders

  • Exodraft Energy A/S · 2026 · $968KNødlastkedel - Energi Ikast Varme A/S

Procurement contact

The notice names a procurement contact for clarification questions.

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.