Drafting of the PIGA East Zone project at Teruel Airport 2026 Tender
Original: Redacción del proyecto PIGA Zona Este en el Aeropuerto de Teruel
Consorcio del Aeropuerto de Teruel
- Value
- €424K
- Closes
- 14 Dec 2026
- Where
- Spain
- Contract
- Consulting · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering consulting. Delivery covers Spain (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures the drafting of a project (PIGA Zona Este) for an area of Teruel Airport, a design and engineering consulting assignment with an estimated value of about €350,000 (excluding VAT). It suits engineering and architecture consultancies with infrastructure design experience, and small firms could plausibly bid, though the description does not state a climate or sustainability focus.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Consorcio del Aeropuerto de Teruel is procuring the drafting of the project for the PIGA Zona Este (the eastern zone plan) at Teruel Airport, Aragón, Spain. The contract is classified as a services contract under CPV 71356200 (technical assistance services), with execution in Teruel. It is tendered through an open procedure with ordinary processing and no EU funding. The public notice gives a base bidding budget and estimated contract value of EUR 350,000.00, both excluding taxes. The file reference is CAT_2026_11. The published documents listed on the page are the Anuncio de Licitación (tender notice, 06/11/2026), a justificatory report (memoria justificativa), a report confirming budget availability (informe de existencia de crédito), the agreement initiating the file, and the document approving the file. The tender specifications entry (Pliego) is shown as empty on the page. The page does not state deliverables, the detailed technical scope, or the expected contract duration. These would need to be confirmed in the tender specifications, which are not available on this page.
Key requirements
- Prepare the technical project documentation for the PIGA Zona Este area at Teruel Airport
- Engineering or architecture design capability for airport infrastructure
- Single assignment with an estimated value of about €350,000 excluding VAT
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)