This tender has closed. The deadline passed 86 days ago.
You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.
Drainage construction works – sustainability infrastructure project: stormwater-management development 2026 Tender
organisation
In context
This is a contract notice published by a corporate buyer covering construction and works. Delivery covers Hungary and the European Union (Europe). It is classified under Sustainable Buildings, Water and Climate Adaptation against the sustainability taxonomy rather than matched on keywords.
A Hungarian airport is procuring drainage and stormwater management infrastructure expansion, including oil-separator upgrades, pipe resizing, and a new retention pond with HDPE lining. Bidders must be experienced in large-scale civil/drainage construction, environmental compliance, and airport operations.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
The procurement concerns drainage construction works at Budapest Liszt Ferenc International Airport as part of the RESILIMET project for stormwater management development. The core works include upgrading the C-0-0 storm drain's silt and oil separator (oil trap) from a current cleaning/hydrological capacity of 400/720 l/s to 2,270 l/s. The existing C-0-0 backbone storm drain pipe system must also be upsized: 159 linear metres from DN1250 to DN1650, and 147 linear metres from DN1250 to a 3.5-metre bottom-width element. …
Relevant sectors
The direct link to bid is a Pro feature.