Dryburn Footbridge Replacement - PROW 302146 2027 Tender
Westmorland and Furness Council
- Value
- Not stated · check listing
- Closes
- 7 Jan 2027
- Where
- United Kingdom
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 27 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers United Kingdom (Europe). It is classified under Climate Adaptation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Westmorland and Furness Council is procuring a two-stage design and build contract for a new 34 metre two-span footbridge over the South Tyne on PRoW 302146 in the North Pennines, with a flood-resilient pier design and completion of all consents. Bidders suited to this are experienced civil engineering and bridge contractors able to deliver design, consenting and construction within an in-river working window.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Westmorland and Furness Council (the Authority) is procuring a contractor to design and build a new 34 metre two-span footbridge over the South Tyne River on Public Right of Way 302146, near Dryburn, Garrigill, in the Alston parish. The existing footbridge failed, and the new structure must have a minimum walking width of 1.2 metres and a pier design suitable for frequent flash flooding. The route forms part of the Pennine Way National Trail, so the work must meet National Trails Quality Standards. The site lies within the North Pennines National Landscape, near the remote village of Garrigill. The contract is a two-stage Design and Build. In Stage 1, the contractor completes the full design and obtains all necessary consents, permits and orders. In Stage 2, construction starts as soon as possible after 1 April 2028, subject to funding, and where required uses the in-river working window of 16 June to 30 September.
Key requirements
- Full design, planning and consents for a 34m two-span footbridge with minimum 1.2m walking width
- Pier design resilient to frequent flash flooding, with construction in the 16 June to 30 September in-river window
- Delivery to National Trails Quality Standards on the Pennine Way within a North Pennines National Landscape
Relevant sectors
How this compares
About this sector
About this sector
Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)