Skip to content
Raise Lens
Tender · TED (EU)

E-MOB Phase 4 charging station expansion, various sites – framework for electrical works

Original: Electrical wiring and fitting work – 6261 A00 E-MOB Phase 4 Ausbau Ladesäulen div. Standorte - Rahmenvereinbarung EM- und Bauleistung

Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft

Value
Not stated · check listing
Closes
10 Dec 2026
 
Where
Austria
Contract
Works · Soe

Free accounts: 1 official link a month · Pro: every link

Pro early accessIn public feeds and alerts from 30 Nov. This page is open to everyone now.

In context

This is a contract notice published by a state-owned enterprise covering construction and works. Bids are invited through a framework agreement. Delivery covers Austria (Europe). It is classified under Electric Mobility and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

ASFiNAG, Austria's motorway company, is procuring electrical wiring and construction works under a framework agreement to build EV charging infrastructure at its own sites across Austria, including motorway depots, toll stations and operating stations. It suits Austrian electrical installation contractors and SMEs that can deliver on-site EV charger installations.

Summary by Raise Lens from the official notice · 24 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

This is a framework agreement (Rahmenvereinbarung) for construction work to install electric vehicle charging infrastructure at ASFiNAG sites across Austria, titled 'Electrical wiring and fitting work - 6261 A00 E-MOB Phase 4 Ausbau Ladesäulen div. Standorte - Rahmenvereinbarung EM- und Bauleistung'. The charging infrastructure is intended for ASFiNAG's internal use. The sites include motorway maintenance depots (Autobahnmeistereien, ABM), main toll stations (Hauptmautstellen, HMS), operational technology sites (Betriebstechnikstandorte, BTE), bases (Stützpunkte, STP), operating stations (Betriebsstationen, BS) and other ASFiNAG locations (STO). The page text does not state the estimated value, the term of the framework, or the number of call-offs. The title refers to both electrical installation (EM) and construction (Bau) services.

Key requirements

  • Electrical wiring and fitting works for EV charging stations at multiple ASFiNAG sites in Austria
  • Framework agreement covering electrical and construction services for call-off orders
  • Charging infrastructure is for ASFiNAG internal use at depots, toll stations and operating sites

CPV codes

Relevant sectors

E-Mobility tendersInfrastructure

How this compares

About this sector

Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published23 Nov 2026
Closes10 Dec 2026, 00:00 UTC
Buyer typeSoe
TypeWorks
MethodFramework
DeliveryOn-site
CountryAustria
RegionEurope
Last verified24 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in framework agreements; typical only, not this buyer’s list. Check the official notice.

  • Selection questionnaire or qualification form
  • Company registration certificate
  • Audited financial statements
  • Insurance certificates
  • Case studies or references for similar work
  • Quality, health and safety, and environmental policies