Electricity distribution and control apparatus – Laivurinkatu substation medium-voltage switchgear renewal

Original: Electricity distribution and control apparatus – Laivurinkadun sähkönsyöttöaseman keskijännitekoneiston uusinta

Helsingin Joukkoliikenneinfra Oy

Value
Not stated · check listing
Closes
17 Dec 2026
 
Where
Finland
Contract
Mixed · Soe

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 35 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 12 Nov 202635 days to prepare
Found today · 24 Nov 202623 days to prepare

In context

This is a contract notice published by a state-owned enterprise covering a mix of works, supplies and services. Delivery covers Finland and the European Union (Europe). It is classified under Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Helsinki Joukkoliikenneinfra is procuring supply and installation of a new medium-voltage switchgear for the Laivurinkatu electricity substation. It suits established electrical contractors or switchgear suppliers with substation installation experience rather than early-stage companies.

Summary by Raise Lens from the official notice · 18 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Pääkaupunkiseudun Kaupunkiliikenne Oy is running a procurement on behalf of Helsingin Joukkoliikenneinfra Oy for the replacement of the medium-voltage switchgear (keskijännitekoneisto) at the Laivurinkatu power supply substation. The scope covers the supply and installation of the substation's medium-voltage switchgear, as set out in the tender specification, procurement programme, and other annexes. The tender documentation contains critical information about the buyer's infrastructure. It is not published openly. Bidders must request it by email from project manager Omid Musawi and from kilpailutus@kaupunkiliikenne.fi, sending the request to both addresses. The request must include Annex 3, the non-disclosure undertaking (Salassapitositoumus 64H26), signed. The buyer reserves the right to assess requests and to ask for further information. A site visit is optional and must be arranged with the buyer at a mutually agreed time, with registration by 26 November 2026. Questions cannot be asked during the site visit and will not be answered there. All questions must be submitted in writing through the Tarjouspalvelu.fi portal. Contract duration and delivery timeline are not stated in the notice text provided.

Bidder eligibility

Bidders must obtain the tender documentation by sending a request to the named buyer contacts, including a signed non-disclosure undertaking (Annex 3, Salassapitositoumus 64H26). No other eligibility requirements (registrations, references, financial thresholds, or technical qualifications) appear in the text provided.

Key requirements

  • Supply and installation of medium-voltage switchgear at the Laivurinkatu substation in Helsinki
  • Site familiarisation optional, registration required by 26.11.2026; documents requested via Tarjouspalvelu.fi with signed NDA (liite 3)
  • Questions must be submitted in writing via Tarjouspalvelu.fi; closing date 17.12.2026

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

Relevant sectors

Grid Mod tendersInfrastructure

How this compares

About this sector

Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published12 Nov 2026
Closes17 Dec 2026
Buyer typeSoe
TypeMixed
DeliveryOn-site
CountryFinland
RegionEurope
SubmissionNot specified in the excerpt. Questions must be submitted in writing via the Tar
Last verified18 Nov 2026

Documents to prepare

Named in this notice. Check the official notice for the full list.

  • Annex 3, the non-disclosure undertaking (Salassapitositoumus 64H26), signed