This tender closed on 12 May 2026. The deadline passed 197 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
- Installation of renewable electricity storage in public facilities, Porąbka Municipality, part I
- Comprehensive electricity supply and settlement of microinstallation energy for GPK Szemud
- Petroleum products, fuel, electricity and other sources of energy – Zakup energii elektrycznej dla ZGO AQUARIUM Sp. z o.o.
Electricity, heating, solar and nuclear energy – Unrestricted tender for the supply and purchase of electrical energy – Purchasing Group No. 165/ 2026 Voltra
Original: Electricity, heating, solar and nuclear energy – Przetarg nieograniczony na dostawę i odkup energii elektrycznej – Grupa Zakupowa nr 165/2026 Voltra
Voltra S.A. - Pełnomocnik Zamawiających
- Value
- PLN 59.2M
- Closes
- 12 May 2026Closing date passed
- Where
- Poland
- Contract
- Supplies · Other
In context
This is a contract notice covering the supply of goods. Bids are invited through an open procedure. Delivery covers Poland (Europe). It is classified under Renewable Energy and Grid Modernisation against the sustainability taxonomy rather than matched on keywords.
Summary
This tender is for the supply and buyback of electricity for a purchasing group in Poland, requiring compliance with Polish energy regulations and quality standards. Suitable bidders are licensed electricity suppliers operating in the Polish energy market with experience in group procurement arrangements.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Voltra S.A., acting as authorized representative for a group purchasing consortium (Grupa Zakupowa nr 165/2026) comprising 28 Polish public-sector entities, is conducting an open tender for the supply and buyback (odkup) of electricity. The contract covers municipalities, water and sewage utilities, district heating companies, cultural institutions, hospitals, public transport operators, port authorities, and other municipal entities located across Poland (including Warsaw, Kutno, Olesno, Paradyż, Praszka, Goszczanów, Strzyżewice, Karlino, and notably a large cluster in Elbląg). The scope includes electricity delivery to consumption points listed in the SWZ (Terms of Reference) covering tariff groups Cxx Oxx (street lighting), Cxx, Gxx, R, and Bxx. The supply must comply with the Polish Energy Law (ustawa PE) and implementing regulations, in particular the Regulation of the Minister of Climate and Environment of 22 March 2023 on detailed conditions for the operation of the electricity system. The contract also includes the buyback (odkup) of electricity, suggesting it covers prosumer/self-generated energy buyback arrangements. The contract duration is three years, from 1 January 2027 to 31 December 2029. The total estimated value is PLN 56,373,412.70 excluding VAT. Procurement documents are available via the Platforma Zakupowa OpenNexus platform at https://platformazakupowa.pl/pn/voltra.
Bidder eligibility
Bidders must not be subject to the exclusion grounds set out in the Polish Public Procurement Act (Pzp) and Directive 2014/24/EU, including grounds related to corruption, fraud, tax/social security non-payment, child labour/trafficking, money laundering or terrorist financing, bankruptcy, participation in criminal organisation, anti-competitive agreements, and national exclusion grounds. Bidders must submit a European Single Procurement Document (ESPD/JEDZ). Detailed eligibility, selection criteria, and required documentation are set out in the Specification of Terms of Contract (SWZ) available at https://platformazakupowa.pl/pn/voltra. A bid bond (wadium) is required, with details in the SWZ. Qualified electronic signature (per Regulation EU 910/2014) is required.
How bids are scored
Sole award criterion is Price (100% weighting). Scoring formula: C = (C_min / C_x) × 100, calculated to two decimal places. The non-rejected bid from a non-excluded bidder achieving the highest score (maximum 100 points) will be selected as most advantageous.
Key requirements
- Delivery and buyback of electricity compliant with Polish Energy Law
- Adherence to quality standards per Ministry of Climate and Environment regulations from March 2023
- Service provision for specific consumption points listed in tender specifications
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)